Laserfiche WebLink
<br />Drainage and Flood Control District; and drainage representatives from the counties of: <br />Adams; Arapahoe; Boulder; Denver; Douglas; Eagle; Jefferson; Larimer and Logan. <br />Additionally, please also call drainage and flood control engineers from any of the following <br />cities: Aurora; Boulder; Castle Rock; Commerce City; Denver; Evans; FOlt Collins; Frisco; <br />Greenwood Village; Sterling; Vail; Victor; and Woodland Park. <br /> <br />C. PersonneIlResources Commitment <br /> <br />Personnel: The ICON Team currently has the capacity to undertake a contract of this size and <br />complexity in the required time. Our significant relevant review experience, expertise, and <br />familiarity with the CWCB will eliminate much of the learning curve and will allow us to get <br />off to a quick start. The depth and breadth of professional staff, management structure, <br />automated project tracking system information, and previous experience allow us to assure the <br />CWCB that we can conduct and support this contract without sacrificing task schedule or <br />technical quality. Additionally, our state-of-the-art equipment, moderate workload, and <br />experience in mobilizing for projects on a compressed schedule make us uniquely qualified to <br />meet your needs. While every single person from our firms could not possibly be available, <br />we do have access to a large and deep pool of individuals to more than adequately support <br />whatever tasks may be required by the CWCB. Tasks may be assigned to any of the <br />following personnel who are the ICON core group of professionals: <br /> <br />Personnel/ <br />Project Assi~nment <br /> <br />F'irm Title <br /> <br />Yeal's of <br />Experience <br /> <br />Principal <br />Penn Gildersleeve, P.E. <br /> <br />President (ICON) <br /> <br />26 <br /> <br />Technical Advisor <br />Douglas J. Williams, P.E. <br /> <br />Vice President <br /> <br />21 <br /> <br />Sellior Professional <br />Matthew.J. Ursetta, P.E. <br />Mike Vinson, P .E. <br />Terri Fead, P.E. <br />Kent D. Barringer, P.E. <br /> <br />S ecretary Treasurer <br />Project Manager <br />Project Manger <br />Project Engineer <br /> <br />16 <br />21 <br />18 <br />17 <br /> <br />Engineering Staff <br />Curtis Y. Neufeld, E.IT <br />Rick A. Rome, E.LT. <br />Craig Jacobson, E.LT. <br />Troy Carmann <br />Deborah Yeager <br /> <br />Engineer <br />Engineer <br />Engineer <br />Engineer <br />Engineer <br /> <br />5 <br />7 <br />2 <br />2 <br />I <br /> <br />D. Authority <br />Penn Gildersleeve is authorized to sign contracts on behalf of ICON Engineering, and has full <br />authority to assign personnel and authorize expenditures as required for the project. The final <br />report will be prepared under the direct supervision of Penn Gildersleeve P.E., who will be <br />personally involved in overseeing all aspects of the project. <br /> <br />20 <br />