My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02521
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:41 PM
Creation date
10/4/2006 10:57:30 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
Reclamation's Role in Colorado Flood Control
Date
7/1/1965
Prepared For
State of Colorado
Prepared By
BOR
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />NAR:aC\{8 DAM AND RESERVOIR <br />, (Xarrows Unit) <br /> <br />The Narrows Unit, proposed for reauthorization and construe- <br /> <br />tion by the Bureau of Reclamation, comprises the potential Narrows <br /> <br />Dam and Reservoir on the South Platte River about 7 miles upstream <br /> <br />from Fort Morgan, Colorado. The damsite is approXimately 70 air <br /> <br />miles northeast of Denver. The need for a reservoir near the present <br /> <br />site has been recognized locally for more than 50 years. <br />The Narrows Dam and Reservoir was authorized as a unit of the <br /> <br />comprehensive Missouri River Basin Project by the flood control acts <br />of 1944 and 1946. Preconstruction activities were initiated in 1947 <br />and a definite plan report was prepared in 1951. Public hearings <br />were held in 1951 which indicated considerable opposition 'to the <br /> <br />plan--principe.lly by residents located in the reservoir area. As a <br /> <br />result of the lack of official support by the State of Colorado, all <br /> <br />activities on the dam and reservoir were terminated. <br /> <br />During the intervening years, many discuss ions and meetings <br />of interested groups were held, a Steering Committee was organized, <br />and the Colorado Water Conservation Board advanced funds to the <br /> <br />Bureau of Reclamation for the resumption of studies. The Bureau <br /> <br />was specifically requested to make a hydrologic study and cost <br />comparison of the upstream Weld CO\ll1ty site. The studies and dis- <br />cussions terminated in a meeting of the Colorado Water ConServation <br /> <br />Board in Fort Morgan on September ll-12, 1964. At that meeting, the <br /> <br />recommended Narrows site was officially approved by the Board as the <br /> <br />desired site. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.