Laserfiche WebLink
<br />Mr. William R. Locke <br />June 22, 1994 <br />Page 2 <br /> <br />along Oak Creek in the left overbank upstream of the railroad tracks to keep the left overbank flows <br />in the new Oak Creek channel. It is our understanding that the developer, who placed the fill in <br />the floodplain, will submit revised floodplain information to FEMA as a part of their work. The <br />revised floodplain information will take the new channel and dike into account. The developer will <br />collect technical data, prepa:e an hydraulic analysis, and submit the new study to FEMA. It is also <br />our understanding that Regi:Jn VIII will work closely with the developer and the Town during this <br />process. <br /> <br />We have been requested by our Regional Project Officer to stop all work on this study due to the <br />physical changes in the floodplain described in this letter. We understand that the new flood study <br />will be submitted by the developer soon. <br /> <br />If you have any questions or require additional information, please feel free to contact me. <br /> <br />Sincerely, <br /> <br />LOVE & ASSOCIATES, INe. <br /> <br />cc: Douglas Gore <br />Dr. John Liou <br /> <br />