Laserfiche WebLink
<br />. <br /> <br />The Honorable Bill Tedesko, Mayor <br />July 19, 1993 <br />Page 3 <br /> <br />My understanding at the conclusion of the meeting was that the developers would be <br />submitting an application for a floodplain development permit in the very near future and <br />that the City would be proceeding with the review of, that application and, if appropriate, <br />the issuance of a permit. That permit would be based on the currently effective PIS', I <br />would recommend that the developers also submit a revised version of the Love and <br />Associates draft computer model. The revisions to the computer model should be based on <br />current topographic data to be derived from field surveys, That revised computer model <br />would serve as the basis of a LOMR that would change the Oak Creek floodplain <br />delineation to represent July 1993 field conditions, <br /> <br />If after reading this letter you still have some questions, problems, or concerns with <br />regard to the Oak Cre,ek floodplain and development in that floodplain, please feel free to <br />contact us, Another meeting in Florence can be arranged if that is what is needed. <br />Meanwhile I hope this letter provides you with some clarification of the current situation, <br /> <br />~ (j2.~ <br /> <br /> <br />Brian R. Hyde <br />Sr, Water Resource Specialist <br />Flood Control and Floodplain <br />Management Section <br /> <br />cc: Virginia Motoyarr.a, FEMA <br /> <br />