My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02422
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02422
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:25 PM
Creation date
10/4/2006 10:53:09 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Nationwide
Basin
Statewide
Title
Flood Proofing: Example of Raising a Private Residence
Date
3/1/1977
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Based on data obtained in this case study and experience gained <br />in other examples, the total cost can range between $10,000 and <br />$33,600 for similar structures. The exact cost will depend upon <br />the degree of difficulty in the raising process and upon the type <br />and amount of construction desired. Figure 16 shows the range of <br />cost to be expected for a similar project. These items are <br />discussed below. <br /> <br /> RANGE OF COST <br /> Range <br /> Item From To <br />1. Architectural Fee $ 600 $ 1 ,800 <br />2. Professional Mover 2,000 7.000 <br />3. Footings and Foundation 1,500 2,800 <br />4. Exterior Treatment 1,000 4,000 <br /> (includes stairs, walkway, etc.) <br />5. Duct Work, Plumbing. and 1,500 3,500 <br /> Electrical Work <br />6. Minor Structural Treatment 900 2,000 , <br /> (i~cludes painting, crack <br /> repair, etc.) <br />7. Modifications to Heating 500 2,500 <br /> and Cooling Systems <br />8. Esthetics 2,000 10,000 <br /> $10,000 $33,600 <br /> <br />FIGURE 16. RANGE OF COST <br /> <br />1. Architectural Fee - This cost is, in general, <br />proportional to the amount of detailed work desired. <br />between 5 percent and 10 percent of the total cost. <br /> <br />di rect1y <br />It ranges <br /> <br />2. Professional Mover - Ranges in this cost are highly dependent <br />upon the type of structure and accessibility. Almost any structure, <br />including a slab-on-grade structure can be raised. Special measures <br />must also be made for structures with fireplaces and chimneys and for <br />features that have been added after the initial construction. The <br />more complicated the structure, the more it will cost. Some <br />structures are located on lots where access is difficult. This <br /> <br />. <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.