My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02368
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:14 PM
Creation date
10/4/2006 10:51:07 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Office of the State engineer Rules and Regulation for Dam Safety Construction
Date
8/26/1988
Prepared For
State of Colorado
Prepared By
Office of The State Engineer
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />9.A.(9) The engineer shall give the State Engineer at least <br />10 days advance written notice of the engineer's final construction <br />inspection. <br /> <br />9.A.(10) The engineer shall notify the State Engineer of <br />the completion of the construction in accordance with Rule 10. <br /> <br />9.B. For Minor, Class I Dams, and Large, Intermediate, and Small <br />dams rated as Class II, the owner shall provide an engineer <br />experienced in dam design and construction, who shall be responsible <br />for the following: <br /> <br />9.B.(1) Not less than 30 days prior to construction or as <br />soon as possible for dams whose construction season is affected by <br />freezing weather, the engineer must notify the State Engineer in <br />writing of the following: <br /> <br />9.B.(1)(a) The date of the start of construction; <br /> <br />9.B.(1)(b) The names and qualifications of the engineer <br />and staff to be used on the project; <br /> <br />9.B.(1)(c) A schedule for construction observation by <br />the engineer, including the foundation of the dam; <br /> <br />9.B.(1)(d) Identification of the firm that will conduct <br />the construction material tests; and <br /> <br />9.B.(1)(e) A schedule of the construction material <br /> <br />tests. <br /> <br />9.B.(2) The engineer shall observe the construction of the <br />dam. It is the engineer's responsibility to make periodic visits to <br />observe the progress and quality of the construction in order to <br />determine whether the construction is proceeding in accordance with <br />the approved plans and specifications. The engineer shall endeavor to <br />guard against defects and deficiencies in the construction of the dam, <br />and shall disapprove or reject the work failing to conform to the <br />approved plans and specifications. Photographs of the progress of the <br />construction shall be taken for the record. <br /> <br />9.B.(3) The engineer shall submit periodic reports as <br />requested by the State Engineer and shall compile a record of all <br />tests conducted, a summary of geologic information as related to the <br />foundations, and any problems and remedies, for submittal at the end <br />of construction. <br /> <br />- 33 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.