My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02368
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:14 PM
Creation date
10/4/2006 10:51:07 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Office of the State engineer Rules and Regulation for Dam Safety Construction
Date
8/26/1988
Prepared For
State of Colorado
Prepared By
Office of The State Engineer
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.A.(4)(a)(III) Existing Minor Class II dams, and <br />Large, Intermediate, and Small Class III dams shall have spillways <br />capable of passing the IOO-year IOF as defined in Rule 5.A.(5)(d). <br /> <br />6.A.(4)(a)(IV) Existing Minor Class III, and <br />Large and Intermediate Class IV dams shall have spillways capable of <br />passing the 50-year IOF as defined in Rule 5.A.(5)(d), <br /> <br />6.A.(4)(a)(V) Existing Small and Minor Class IV <br />dams shall have spillways capable of passing the 25-year IOF as <br />defined by Rule 5,A.(5)(d). <br /> <br />6.A.(4)(a)(VI) The minimum size spillway for all <br />existing Class I dams and Large, Intermediate, and Small Class II <br />dams, for which an incremental damage analysis shows a smaller spill- <br />way is justifiable under Rule 5,A.(5)(c), is the IOO-year flood as <br />defined by Rule 5.A.(5)(d). <br /> <br />6.A.(4)(a)(VII) For dams whose spillway cannot <br />pass the IOF as defined above, the engineer may, as an alternative, <br />provide documentation that overtopping by floods which exceed the <br />spillway capacity, will not cuase failure of the dam. <br /> <br />6.A.(4)(b) The minimum freeboard requirements for an <br />existing dam shall be based upon the maximum depth determined to <br />either prevent overtopping by wave action, or which will pass the IOF, <br />or a minimum of three feet, unless the State Engineer approves less <br />for good cause shown. <br /> <br />Rule 7. ReQuirements for RemovinQ or BreachinQ an ExistinQ Oam <br /> <br />Rule 7.A. An owner proposing to Remove or Breach a dam shall <br />submit an application package in a form acceptable to the State <br />Engineer prior to commencing work. Plans for Removal or Breach of a <br />dam shall meet the following requirements: <br /> <br />7.A.(I) A completed application form provided by the State <br /> <br />Engineer. <br /> <br />7.A.(2) For Class I and Class II dams, A breach plan <br />prepared by an engineer. <br /> <br />- 29 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.