My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02368
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:14 PM
Creation date
10/4/2006 10:51:07 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Basin
Statewide
Title
Office of the State engineer Rules and Regulation for Dam Safety Construction
Date
8/26/1988
Prepared For
State of Colorado
Prepared By
Office of The State Engineer
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5.A.(8)(c) Class III dams shall have the following instrumen- <br />tation: <br /> <br />5.A.(8)(c)(I) Gage' rods as described in Rule 5.A.(8)(a) <br />above; and <br /> <br />5.A.(8)(c)(II) Seepage weirs or flumes to allow monitoring <br />of leakage through the embankment or foundation. <br /> <br />5,A.(8((d) Class IV dams will not require instrumentation. <br /> <br />5.A.(9) A detailed cost estimate of the construction of the dam <br />including the engineering fees. The cost estimate will remain <br />confidential until after the construction contract is executed. <br /> <br />5.A.(10) A filing fee of $2.00 per $1,000 (or fraction thereof) <br />of the cost estimate, limited to a maximum of $200.00. (See Rule <br />17.) <br /> <br />Rule 6. Reauirements for Alteration. Moficatation. or Reoair of an <br />Existina Dam Which will Affect the Safetv of the Structure. <br /> <br />Rule 6.A. An owner proposing to alter, modify, or repair a dam <br />shall submit an application package in a form acceptable to the State <br />Engineer and receive approval of the construction plans and <br />specifications from the State Engineer prior to construction. The <br />provisions of Rule 6 shall apply to such application only to the <br />extent they directly relate to the activity for which approval is <br />being sought. <br /> <br />6.A,(1) The requirements of Rule 5.A.(1), 5,A.(2), 5.A.(3), <br />5.A.(9), and 5.A.(10) shall apply except as modified by Rules 6,A.(2) <br />and 6.A.(3). The requirements of Rules 5.A.(5) (Hydrology Report), <br />5.A.(6) (Geotechnical Report), 5.A.(7) (Design Report), 5.A.(8) <br />(Instrumentation) apply only where they are needed to support the <br />application. <br /> <br />6.A.(2) Plans for the repair of a dam, or alteration of Class I <br />or Class II dams to nonjurisdictional size may be approved by the <br />State Engineer by letter in lieu of the formal plans procedure per <br />Rule 5.A.(2) and 5.A.(3) subject to the following conditions: <br /> <br />- 26 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.