My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02324
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:07 PM
Creation date
10/4/2006 10:48:43 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
32
County
Adams
Community
Federal Heights
Basin
South Platte
Title
Water and Drainage at Niver Creek, Phases 1 and 2: Cities of Federal Heights and Thornton, Colorado
Date
2/1/1974
Designation Date
6/1/1974
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CHAPTER V <br /> <br />RECOMMENDED SEQUENCE OF IfvV>LEMENTATION <br /> <br />General <br /> <br />The rehabilitation of the entire Niver Creek will be implemented in <br />phases due to budgetary restrictions. Some of the recommended madifications <br />have 0 higher priority than others due to their greater effect on the overall <br />drainage basin or due to the fact that their functioning is required for other <br />modifications to function properly. Actually, the proposed modifications fall <br />into two categories: high priority and low priority. <br /> <br />High Priority Items <br /> <br />Detention Ponds <br /> <br />The Tributary L detention pond at Interstate 25 and the Niver Creek <br /> <br />detention pond at East 88th Avenue hove the very pronounced effect of reducing <br /> <br />Niver Creek flows. The entire scheme downstream of East 88th Avenue has been <br /> <br />laid out on the basis that these detention ponds will be constructed. These two <br /> <br /> <br />ponds should be given the highest priority of the entire project. <br /> <br />Channel Below Explorodor Calle <br /> <br />The channel reach downstream of Explorador Calle has been damaged <br />extensively by the May 5, 1973 flood. In addition, considerable developed <br />property along this reach is within the present 100-year flood plain. The pro- <br />posed modification of this reach will contain the 1 DO-year flood within the <br />channel; therefore, this reach should be the second phose of development. <br /> <br />V-l <br />
The URL can be used to link to this page
Your browser does not support the video tag.