My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02288
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02288
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:24:01 PM
Creation date
10/4/2006 10:46:57 PM
Metadata
Fields
Template:
Floodplain Documents
County
Prowers
Basin
Arkansas
Title
Town of Wiley Prowers County Flood Mitigation Study Hazard Mitigation Grant Application
Date
1/1/1998
Prepared For
FEMA
Prepared By
CWCB
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />PROPOSED SOLUTIONS <br /> <br />A complete description of every alternative is provided in Section VII of the project report. <br />Below is a list of the alternatives with a very brief description following each alternative: <br /> <br />Alternative 1 - No Action: <br />Leave conditions as they are today. This is the "Do Nothing" Alternative. <br /> <br />Alternative 2 - New levees upstream of State Highway 196: <br />Construct levees on the east and west sides of Wiley Drainage Ditch upstream of State Highway <br />196 to protect existing residential development. Provide up to 100-year level of protection for all <br />residential structures in the project area. <br /> <br />Alternative 3 - Floodproofing, relocation, or elevation of flood prone structures: <br />Floodproof, relocate, or elevate all of the flood prone residential structures near the Wiley <br />drainage ditch upstream of State Highway 196 at the north end of town. This would be a stand- <br />alone alternative and would not require construction of alternative 2. <br /> <br />Alternative 4 - New Bridge at State Highway 196 and associated channel improvements: <br />Construct transition channel upstream and downstream of the Colorado Highway 196 <br />embankment. Add additional bridge structure at Highway 196. Provide up to 100-year level of <br />protection for all but three residential structures in the project area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.