Laserfiche WebLink
<br />2.9 <br /> <br />2.10 <br /> <br />2.11 <br />2.12 <br />2.13 <br />2.14 <br /> <br />2.15 <br /> <br />TABLE OF CONTENTS--Continued <br /> <br />TABLES (Continued) <br /> <br />Monthly average flows entering AB Lateral <br />Hydropower Facility in ft'/s. <br />(Alternative E--950-ft'/s turbine capacity, <br />no Tunnel modifications) ....... <br />Monthly average flows entering AB Lateral <br />Hydropower Facility in ft'/s. <br />(Alternative F--1,135-ft'/s turbine <br />capacity, no Tunnel modification, with <br />de-icing flows) ........... <br />Summary of characteristics, alternative G <br />Summary of minimum flow alternatives <br />Summary comparison of alternatives <br />Alternative cost data and financial <br />feasibility analysis (in $1,000) <br />Impacts of alternatives . . . . . . <br /> <br />Page <br /> <br />54 <br /> <br />55 <br />63 <br />68 <br />72 <br /> <br />73 <br />74 <br /> <br />CHAPTER 3 <br /> <br />AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES <br /> <br />3.1 <br /> <br />3.2 <br /> <br />3.3 <br />3.4 <br /> <br />3.5 <br />3.6 <br /> <br />3.7 <br /> <br />3.8 <br /> <br />3.9 <br /> <br />3.10 <br /> <br />Simulated flows in the Gunnison River <br />below Crystal Reservoir (ft'/s) <br />Average monthly flows (ft'/s) entering <br />the Black Canyon for alternative A <br />(no-action) condition (1952-1983) <br />Simulated flows in the Uncompahgre <br />River below Colona (ft'/s) <br />Average monthly flows (ft'/s) at <br />various locations along the Uncompahgre <br />River (alternative A) <br />Peak discharges for area streams (ft'/s) <br />Average monthly flows in the Gunnison <br />River entering the Black Canyon for each <br />alternative (ft'/s) ... . <br />Flows entering the Black Canyon (ft'/s). <br />(Alternative A--no-action conditions) <br />Flows entering the Black Canyon (ft'/s) <br />(Alternative B--1,135-ft'/s turbine capacity, <br />no Tunnel modifications) .. ..... <br />Flows entering the Black Canyon <br />(ft'/s). (Alternative C--1,135-ft'/s turbine <br />capacity and 1,300-ft'/s Tunnel capacity) <br />Flows entering the Black Canyon (ft'/s). <br />(Alternative E--950-ft'/s turbine capacity, <br />no Tunnel modifications) ........... <br /> <br />viii <br /> <br />86 <br /> <br />87 <br /> <br />88 <br /> <br />89 <br />90 <br /> <br />92 <br /> <br />94 <br /> <br />95 <br /> <br />96 <br /> <br />97 <br />