My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02242
CWCB
>
Floodplain Documents
>
Backfile
>
2001-3000
>
FLOOD02242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 6:23:52 PM
Creation date
10/4/2006 10:43:12 PM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Uncompahgre Valley
Basin
Gunnison
Title
Uncompahgre Valley Reclamation Project - Hydropower - Part 1 - Final Environmental Impact Statement
Date
8/28/1990
Floodplain - Doc Type
Project
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
400
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE OF CONTENTS--Continued <br /> <br />Page <br /> <br />CHAPTER 8 <br /> <br />INDEX <br /> <br />LIST OF ABBREVIATIONS AND ACRONYMS <br /> <br />309 <br />313 <br /> <br />. . . . . . . . . . . <br /> <br />. . . . . <br /> <br />ATTACHMENTS <br /> <br />S-l Short- and long-term impacts resulting <br />from alternatives--AB Lateral Project <br />S-2 Summary comparison of alternatives-- <br />AB Lateral Project ......... <br />S-3 Alternative cost data and financial <br />feasibility analysis--AB Lateral Project <br /> <br />($1,000) . . . . . . . . . . . . . . . . <br />S-4 Impacts of alternatives--AB Lateral Project <br /> <br />SUMMARY <br /> <br />Attachment A--Environmental commitments <br />Attachment B--Historical flows in the Gunnison River <br />Attachment C--Water quality and biological data <br />Attachment D--Water quantity data for study alternatives <br />Attachment E--Fish and Wildlife Service recommendations <br />Attachment F--Fish and Wildlife Service biological opinion <br />Attachment G--River depth versus flow (Gunnison River) <br /> <br />TABLES <br /> <br />S-16 <br /> <br />S-18 <br /> <br />S-19 <br />S-20 <br /> <br />CHAPTER 2 <br /> <br />2.1 <br /> <br />2.2 <br />2.3 <br />2.4 <br /> <br />2.5 <br />2.6 <br />2.7 <br /> <br />2.8 <br /> <br />ALTERNATIVES INCLUDING PROPOSED ACTION <br /> <br />Estimated supplies and historical demands <br />for the Uncompahgre Valley Reclamation <br />Project .............. <br />Description of Gunnison Tunnel sections <br />Summary of bank stabilization measures <br />Rights-of-way requirements for <br />alternatives B, C, E, and F . <br />Cost estimate for alternative B <br />Cost estimate for alternative E <br />Monthly average flows entering AB Lateral <br />Hydropower Facility in ft'/s. <br />(Alternative B--1,135 ft'/s turbine capacity, <br />no Tunnel modifications) . . . . . . . . <br />Monthly average flows entering AB Lateral <br />Hydropower Facility in ft'/s. <br />(Alternative C--1,135 ft'/s with Tunnel <br />modified to 1,300 ft'/s) . . . . <br /> <br />22 <br />23 <br />39 <br /> <br />44 <br />45 <br />47 <br /> <br />52 <br /> <br />53 <br /> <br />. . . . . . <br /> <br />vii <br />
The URL can be used to link to this page
Your browser does not support the video tag.