Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />Page <br />1 <br />1 <br />1 <br />1 <br />2 <br /> <br />I <br /> <br />SUMMARY <br />The Study Area <br />Hydrologic and Hydraulic Analyses <br />Development of Alternative Plans <br />Benefit Cost Analysis <br />The Master Plan <br /> <br />II-l <br /> <br />III-l <br /> <br />III-2 <br /> <br />II <br /> <br />GENERAL BASIN DESCRIPTION <br /> <br />3 <br /> <br />III HYDROLOGIC ANALYSIS 6 <br />General 6 <br />Delineation of Basins 6 <br />Rainfall 6 <br />Computation of Runoff for Existing Channel Conditions 7 <br />Computation of Runoff After Implementation of the <br />Proposed Master Plan 7 <br /> <br />III-3 <br /> <br />III-4 <br /> <br />IV HYDRAULIC ANALYSIS <br /> <br />13 <br /> <br />DESCRIPTION OF THE ALTERNATE PLANS FOR DEVELOPMENT <br />General <br />Recommendations from the Phase A Report <br />Summary <br /> <br />V <br /> <br />14 <br />l4 <br />14 <br />17 <br /> <br />VI BENEFIT-COST ANALYSIS <br />Determination of Flood Damages <br />Determination of Benefits <br />Evaluation of Costs <br />Comparison of Costs and Benefits <br /> <br />l7 <br />17 <br />l7 <br />l8 <br />20 <br /> <br />III-l <br /> <br />VII THE DRY GULCH MASTER PLAN <br />General Comments <br />Basis of Design <br />Major Drainageway Planning Sheets with <br />Descriptions of Proposed Improvements <br />and Estimated Costs of Proposed Improvements <br /> <br />23 <br />23 <br />23 <br />Sheets 1 of <br />l8 through <br />l8 of l8 <br /> <br />IV-l <br /> <br />VI-2 <br /> <br />VI-3 <br /> <br />Appendices <br />Appendix A <br />Appendix B <br /> <br />Legal Opinion <br />Tabulations of Agencies and Individuals <br />Contacted During Preparation of Report <br /> <br />a-l <br /> <br />VI-4 <br /> <br />a-4 <br /> <br />References <br /> <br />a-4 <br /> <br />VI-5 <br /> <br />VI-6 <br /> <br />LIST OF FIGURES <br /> <br />Page <br /> <br />General Location Map, Dry Gulch <br />and Tributaries <br /> <br />3 <br /> <br />Projected Peak Discharges on <br />Dry Gulch <br /> <br />8 <br /> <br />Projected Peak Discharges on <br />North Dry Gulch <br /> <br />9 <br /> <br />Comparative Hydrographs of Floods <br />Reaching the Intersection of <br />Colfax Avenue and Garrison Street <br />After Construction of Recommended <br />Facilities <br /> <br />lO <br /> <br />Inflow and Outflow Hydrographs at <br />Proposed Detention Pond After <br />Construction of Recommended <br />Facilities <br /> <br />l2 <br /> <br />LIST OF TABLES <br /> <br />Page <br /> <br />Total Rainfall in Storms of 200 <br />Minute Duration on Dry Gulch <br /> <br />7 <br /> <br />Damage Computation Summary <br /> <br />l8 <br /> <br />Average Annual Damages in Each <br />Reach of Dry Gulch <br /> <br />19 <br /> <br />Unit Prices Used in Construction <br />Cost Estimates (April 1979) <br /> <br />19 <br /> <br />Annual Unit Costs for Operation <br />and Maintenance <br /> <br />20 <br /> <br />Estimated Costs of Construction <br />pnd Land Acquisition <br /> <br />2l <br /> <br />Comparison of Benefits and Costs <br />in Each Reach of the Dry Gulch <br />!1aster Plan <br /> <br />22 <br />