Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />l2 <br /> <br />INFLOW <br /> <br /> <br />Hydrologic Characteristics After Implementation of the Master <br /> <br />1500 <br /> <br />14 <br /> <br /> <br />Plan: A pipe system with the capacity to convey the lO-year <br /> <br />flood is proposed for North Dry Gulch. This would <br /> <br />effectively reduce the surface flow in a lOO-year flood <br /> <br /> / "- <br /> 1200 I \ <br /> l~ , <br /> l <br /> 1100 \ <br /> \ <br /> , \ <br /> 10 J \ <br />0 I <br />z , <br />0 I{ \ <br />tJ 900 <br />UJ 1/ \ <br />VI <br /> Cd <br />0: 800 00'" 0 <br />UJ 0..... J \ <br />Il. -I <br />I- ~ V \ <br />UJ 700 , <br />UJ <br />u. J '0 \ <br />tJ J \ <br />QI 600 <br />::I I \ <br />tJ I <br />z 500 \ <br />~ \ <br />0 <br />.J 400 <br />u. <br /> 300 <br /> 200 <br /> <br />so that no overflow into Colfax Gulch would occur. The <br /> <br />pipe system will carry considerably more flow along the <br /> <br />North Dry Gulch route than would be presently conveyed <br /> <br />on the surface. It should be noted that Colfax Gulch, <br /> <br /> <br />after the improvements, will not be exposed to flooding <br /> <br />from North Dry Gulch in floods of lOQ-year magnitude and <br /> <br />smaller. This, however, does not mean that Colfax Gulch <br /> <br />is relieved from its own flood hazard, since it also <br /> <br />conveys flow from its own sub-basin. <br /> <br />This Section has illustrated that the flow rates after construc- <br /> <br />tion of the recommended facilities may be greater, in some <br /> <br /> <br />instances, than those which would presently occur. These in- <br /> <br />creased flow rates have been considered in the design of the <br /> <br />proposed facilities. Thus, the flood hazard which will remain <br /> <br />after construction will not be greater than the hazard which <br /> <br />presently exists. In the majority of cases, the proposed faci- <br /> <br />100 <br /> <br />o <br />o \020 <br /> <br /> <br />lities will carry the ten-year flow underground, thereby reducing <br /> <br />the flood hazard created by surface flows to considerably less <br /> <br />40 60 80 100 120 140 160 \80 200 <br />TIME, MIN., FROM BEGINNING OF STORM <br /> <br />than the present hazard. <br /> <br />FIGURE m-4 <br />INFLOW AND OUTFLOW HYDROGRAPHS <br />AT PROPOSED DETENTION POND AFTER <br />CONSTRUCTION OF RECOMMENDED FACILITIES <br />