My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02106
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD02106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:57:57 PM
Creation date
10/4/2006 10:37:04 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Title
Stream Stability and Scour at Highway Bridges Participant Workbook
Date
10/1/1999
Prepared For
Students
Prepared By
Federal Highway Administration
Floodplain - Doc Type
Educational/Technical/Reference Information
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />IV. REPLACEMENT BRIDGES <br /> <br />A. Replacement bridge characteristics. <br /> <br />1. Length 77.42 m (254 feet) lon9 (contrast with 3'1.19 m (122 foot) <br />span of old brid~les). <br /> <br />2. Abutments <br /> <br />. Spillthrough (sloping) <br />. 76.2 m (250 foot) long guide bank on right side <br />. 152.4 m (500 foot long dike on left side <br /> <br />3. Piers <br /> <br />. 4 piers with spans of 53--74,14-53 feet consisting of 914 mm <br />(36-inch) diameter circular drilled shafts <br /> <br />. Drilled shafts installed to elevation 3B5 feet (7,62 rn [25 feet] <br />deeper than original colurnns) <br /> <br />B. Construction <br /> <br />1, Bids opened March 22, 1995 for completion in 50 days. <br /> <br />2. $25,000 bonus for every day under 50 and $29,000 penalt~ for every <br />day over. <br /> <br />3. Contractor on site March 23, 1 ~195, <br /> <br />4. Contractor got a bonus. <br /> <br />5.15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.