My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD02057
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD02057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:57:59 PM
Creation date
10/4/2006 10:34:35 PM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Weldona
Title
Hazard Mitigation 404 Grant Application
Date
1/30/1998
Prepared For
FEMA
Prepared By
CWCB
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />e <br /> <br />E, DESCRIPTION OF THE PROPOSED PROJECT <br /> <br />Project Location <br />The project area is located in northeastern Colorado in Morgan County. <br /> <br />Project Photos <br />Photographs of the .project area are included in Section III of the project report. <br /> <br />DSRs from Previous Disaster Declarations <br />Not Applicable. <br /> <br />Project Description <br /> <br />. Proposed Scope of Work (inclnding materials and labor): The basic Project Elements are: <br />I) Channel and ring levee system; 2) Construction of a reinforced concrete box culvert under <br />Highway 144. 3) Construction of a 100-year capacity channel downstream of Highway 144; 4) <br />Increase the capacity of existing ditch and culverts located between the railroad embankment and <br />Highway 144; 5)Construct spill structures on the Riverside Canal and the Weldon Valley Ditch. <br /> <br />A detailed description of the proposed project location and the more specific locations of the <br />project elements, with accompanying maps and graphic illustrations, are provided in Sections III <br />and V, respectively, of this report. <br /> <br />. Is project an independent solution of problem or would it be part of a larger project? The <br />project is an independent solution to the problem. <br /> <br />. Future maintenance requirements: Future maintenance will include culvert cleaning, cleaning <br />and mowing ditches, and mowing channels and easements. <br /> <br />-6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.