Laserfiche WebLink
<br />1c <br />~ <br />>-- <br />~, <br /> <br />( <br /> <br />~ <br />~ <br /> <br />TABLE 8 <br /> <br />LAS ANIMAS LOCAL PROTECTION PROJECT <br />DETAILED COST ESTIMATE <br />(JULY 1968 PRICES) <br /> <br />Cost <br />Acct. " <br />No. Item Unit qbantity Unit Cost Item Cost <br /> FEDERAL COSTS <br />02. RELOCATIONS: <br /> Railroad bridge alterations <br /> (From Table 2, Appendix B) $264,300 <br /> TOTAL-RELOCATIONS $264,300 <br />09. CHANNELS: <br /> Channel clearing Ac 87 100-..:00 $ 8,600 <br /> Contingencies 1,000 <br /> TOTAL-CHANNELS $ 9,600 <br /> <br />11. LEVEES. DRAIN DITCHES AND DRAINAGE STRUCTURES: <br /> <br />Levees and Drain Ditches: <br /> <br />Clearing <br />Excavation, borrow <br />Excavation, common <br />Embankment, compacted <br />Embankment, uncompacted <br />Toe trench <br />Jetty Jacks <br /> <br />Ac 130 <br />CY 1,333,000 <br />CY 4D3,OOO <br />CY 1,366,000 <br />CY 36,500 <br />LF 19,300 <br />Ea 2,488 <br /> <br />1ilth 00 <br />0.35 <br />0.35 <br />0.15 <br />0.08 <br />4.00 <br />-60.00 <br /> <br />$ 13,000 <br />466,550 <br />141,050 <br />204,900 <br />2,920 <br />77 ,200 <br />1-4'9,280 <br /> <br />$1,054,900 <br /> <br />SUBTOTAL <br /> <br />43 <br /> <br />,,", <br />