My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01986
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:44 PM
Creation date
10/4/2006 10:31:01 PM
Metadata
Fields
Template:
Floodplain Documents
County
Bent
Community
Las Animas
Stream Name
Arkansas River
Title
Las Animas Local Protection Project Design Memorandum
Date
8/22/1968
Prepared For
Las Animas
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />~~~ <br />if- <br />!:-'ic- <br />~'t <br /> <br />l!1 <br />" <br /> <br />-- <br />~ <br />~ <br />~ <br /> <br />,-~ <br />-' <br />'-. <br /> <br />XIII COST ESTIMATE <br /> <br />13-01. Summary of estimated cost. The estimated cost of the Las Animas <br />Protection Project is $2,190,000. (July 1968 pricG-9).pf which <br />$1,940,000 would be Federal and $250,000 would be NonbFederal. The <br />estimate is summarized in Table 7. A detailed estimate of project costs <br />is* presented in table 8, detailed relocation costs are presented in <br />tables 1 and 2, Appendix B. <br /> <br />13-02. Unit and lump sum prices used in determining the estimated <br />project cost were based on prices of labor and materials prevailing in <br />July 1968. Construction quantities were computed on the basis of the <br />design of the structures and facilities presented in this memorandum. <br />Approximately 12 percent of the estimated contract cost was added as <br />an allowance for contingencies in accordance with ER 1110-2-1301 dated <br />4 November 1966. The estimated cost of engineerin~ design, supervision <br />and administration of construction amounts to about 25.5 percent of the <br />estimated Federal construction cost. Engineering, design, supervision <br />and administration costs were computed using as a guide, curves <br />developed by Office, Chief of Engineers. Estimated overhead costs <br />were based on experience of the Albuquerque District. <br /> <br />13-03. Comparison of estimates. Project document, approved PB-3, and <br />general design memorandum cost estimates are presented in table 7 for <br />comparison. Variances are discussed in subsequent paragraphs. <br /> <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.