Laserfiche WebLink
<br />f <br />.,.. <br />~t(- <br />Ji< <br />~.' . <br /> <br />TABLE 5 <br /> <br />DETAILED ESTIMATE OF REAL ESTATE REQUIREMENTS <br /> <br />Item <br /> <br />Irrigated crop land <br />Dry farming or grazing <br />Grazing (city owned) <br />Industrial potential <br />(city owned) <br />Waste (low lying river <br />overbank) <br />Borrow areas (low lying river <br />overbank) <br />Spoil areas (low lying river <br />overbank) <br />Pit right of station 277+00 to <br />290+00 <br />pondiug areas <br /> <br />Subtotals <br /> <br />Severance <br />Contingencies <br />Acquisition Cost <br />Contingencies <br /> <br />TOTAL <br /> <br />'- <br /> <br /> Acres <br /> Easement Unit Item <br />Fee Flowage Temp,Constr. Cost Cost <br />55 $350 $19,250 <br />48 100 4,800 <br />10 150 1,500 <br />12 250 3,000 <br />60 20 1,200 <br /> 307 2D 6,140 <br /> 12 20 240 <br /> \20 60 1,200 <br /> 24 60 1,440 <br />185 24 339 38,770 <br /> 8,000 <br /> 4,230 <br /> 10,000 <br /> 1,000 <br /> $62,000 <br /> <br /> <br />34 <br />