Laserfiche WebLink
<br />~~ <br />.. <br />c <br />" <br />h <br /> <br />~ <br /> <br />XI - REAL ESTATE; REQUIREMENTS <br /> <br />c <br /> <br />1i <br /> <br />11~Ol. General. As indicated in para2raph 1-05, local interests <br />would be required to fu~ish assurances that they would provide all lands, <br />easements, am~ rights-of-way needed f~r coustructi~, operation and <br />maintenamce of the project. A gross appraisal of lanG requirements was <br />prepared by the Real Estate Division of the Albuquerque District in <br />order to provide a reasonable estimate of the cost of real estate require- <br />ments. Although local interests would only be required to furnish an <br />ample degree of title to provide sufficient area for construction and <br />proper operatiom and maintema~e. the appraisal was based on the follow- <br />ing criteria wl\icllt would meet the nee&s for construction and operation <br />and also protect the interests of the local sponsors: a. Lands required <br />for construct:l,lm, operatio:m arnt maillltel1Ml1!M:e purposes would be acquired <br />in fee, b. lamds required outside of normal rights-of-way limits and <br />located in l~ lying river overbank areas intended for borrow or spoil <br />would be acqu:l.red as temporary construction easements, ana c. flowage <br />easements would be acquired on lands intermittently iuumdated by temporary <br />p<<mdilmg of interior rUlllloff during periMs when outlet structures are <br />blocked by flQles in the Arkansas River. <br /> <br />11-02. A de~ailed estimate of cost of lands re~uire~ for the project <br />is 'presented bn table 5. Allowances for severance, conti1lllgencies and <br />ac~~isiti~ costs are include~. Total estimated real estate cost is <br />$62,~OO. AbOUt 185 acres of fee lands witkin tfte levee right-of-way <br />would be re~1J:I,recl. Alilout 307 acres for blo\lrrow areas and about 12 acres <br />for spoil areas in low lying river over~nk areas would be requires for <br />teilllporary construction easement. Also, about 20 acres for temporary <br />c01llstructi~ ~aseme1!lt would be requirei OD the right from station <br />211+00 to 290+00 waich wo~ld be a ponding area deepened by excavation <br />to increase the ""OO!.~ing capacity. Abo'ut 24 acres of flowage easement <br />would be required for pending areas. <br /> <br />11-03. L~el i1ll~erests were fu~isked preliminary maps on 20 MercD <br />1968 to apprise them of t~eir responsibilities in providing project <br />riglats-of-way 8ll'10 to aid them illl estsblislllillilg tlte amount illlvolved. <br />Limits of rights-of-way required are s~~ on plates 4 through 11. <br /> <br />33 <br />