Laserfiche WebLink
<br />Sincerely, <br /> <br /> <br />" .-..;, <br /> <br />2 <br /> <br />All required items are to be submitted to us at the address shown at the bottom of the first page. If all <br />required items are not submitted within 90 days of the date of this letter, we will treat any subsequent <br />request as an original submittal, and it will be subject to all submittal/payment procedures. <br /> <br />If you are unable to meet the 90-day deadline for submittal of required items, and would like FEMA to <br />continue processing your request, you must request an extension of the deadline, This request must be <br />submitted to us in writing and must provide (I) the reason why the data cannot be submitted within the <br />requested timeframe, and (2) a new date for the submittal of the data. FEMA receives a very large volume <br />of requests and cannot maintain inactive requests for an indefinite period of time, Therefore, the fees will <br />be forfeited for any request for which neither the requested data nor a written extension request is received <br />within 90 days. <br /> <br />When you write us about your request, please include the case number referenced above in your letter. <br /> <br />If you have general questions about your request, FEMA policy, or the National Flood Insurance Program, <br />please call the FEMA Map Assistance Center, toll free, at 1-877-FEMA MAP (1-877-336-2627). If you <br />have specific questions concerning your request, please call the Revisions Coordinator for your State, <br />Kira L. Brooks, who maybe reached at (703) 317-3067. <br /> <br />d~,{ ~-- <br /> <br />Andrea L. Ryon, P.E., Director <br />Engineering Division <br />Michael Baker Jr., Inc. <br /> <br />cc: Mr. Kevin Stilson, P.E. <br />Floodplain Administrator <br />Pikes Peak Regional Building Department <br /> <br />Mr. Chuck Schoninger <br />Zephyr Development <br />