My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01852
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01852
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:40:49 AM
Creation date
10/4/2006 10:25:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Title
The Colorado Drought Response Plan
Date
6/1/1990
Prepared For
State of Colorado
Prepared By
Division of Disaster Emergency Services
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7/07/90 <br /> <br />The C%r(J(.1o Drought Response Plan - Figure 3 <br /> <br />When declared by R&R Phase 3 <br />TF based on <br /> <br />data provided by the <br />WATF. and Impact <br />Task Forces. . <br /> <br />1. R&R Task Force prepares a Governor's ProdarTla- <br />tlon II drought emergency, <br /> <br />2. Governor's Proclamation activates the IACG, <br /> <br />e <br /> <br />3. ActIvated Task Forces (TF 2-9) continue torTlake <br />aS$8SSlTlenlS and repOrt. All Impact task forces <br />are activated at this tlme_ . <br /> <br />4. Unmet needs are passed to the IACG, <br /> <br />5_ The IACG determlnes which needs can be met by <br />reallocation II existing resources. Thcise which <br />cannot are forwarded to the Governor wlth recOm- <br />mendations. <br /> <br />6. IACG assembles data needed to. support a request <br />by the Governor for . a Presldentlal Drought DllCla- <br />ration. <br /> <br />7. The Governor requests a Presidential Declaratlo~. <br /> <br />8. " approved, Federal-State Agreement estabIbll1es <br />DMsIon Director II DODES as State CooreJllllitlng <br />OIIIcer for Drought. <br /> <br />As drought recedes Phase 3 <br />based on recommenda- <br />tion <br /> <br />1. IACG determines all requirements for asslstal1CEt are <br />now being met wlthln of IACG established chan- <br />nels. <br /> <br />2. IACG prepares a Governor's Proclamation which <br />ends the drought emergency. <br /> <br />3. IACG terminates activity. Issues final report. <br />:i! <br /> <br />e <br /> <br />Lowest readingat:-1.6 Retum to Phase 2 <br />in any river basin based <br />on recommendation II <br />Review and Reporting <br />TaskForce (TF-X) <br /> <br />1. Impact Task Forces (TF's 2-9) andrevlewreportlng <br />Task Force (TF-X) continue to make assesslTl4~nts. <br />Selected impact task forces may be deactlvatetl. <br /> <br />Retum to Phase 1 1. Impact task forces (TF's 2-9) (and revif1.N and <br />reporting task foree (TF-X) terminate actIIilty, bsue <br />final report. <br /> <br />lJi.ii.i]:~:~lI <br /> <br />., ~, ~ <br /> <br />.~ <br /> <br />Lowest reading at -0.6 Return to normal 1. WATF deactivated. <br />in any river basin and condttlons <br />based on recommenda- <br />tion II WATF and <br />DODES <br /> <br />2_ DODES continues to moottor Water Availability <br />Status Report and other water avalablllty data. <br /> <br />e <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.