My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01851
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:07 PM
Creation date
10/4/2006 10:25:25 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Golden
Stream Name
Clear Creek
Title
Major Drainageway Planning
Date
9/1/1982
Prepared For
Jefferson County
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C-9 <br /> <br />COMMENTARY ON SHEET 3 <br /> <br />Reach 2 <br /> <br />Station 800+00 to Station 850+00 <br /> <br />COST ESTIMATE <br /> <br />Reach 2 <br /> <br />Station 800+00 to Station 850+00 <br /> <br />There are t\\Q locations where the lOO-year water surface exceeds the eleva- <br />tion of the south bank of the channel between Stations 822+00 and 829+00 by <br />up to 1 foot. It is recommended that the south bank be rai sed in thi s area <br />to prevent overflows. The hi9h pressure gas main which presently spans the <br />creek with an aerial crossin9 should be replaced by an underground pipeline <br />to protect against washout by high velocity flows. <br /> <br />CONSTRUCTION <br /> <br />Raise South Bank of Channel <br />Station 822+00 to 829+00 <br /> <br />Util ity Relocation Costs <br /> <br />No other flood hazard s ex i st wi thi n thi s segment of Reach 2, and therefore <br />regulation of the existing 100-year floodplain is the recommended strategy. <br /> <br />TOTAL CONSTRUCTION COSTS <br /> <br />ENGINEERING AND CONTINGENCIES (30% of Construction Costs) <br /> <br />FISCAL, LEGAL AND ADMINISTRATIVE (10% of Above Total) <br /> <br />PROPERTY ACQUISITION COSTS <br /> <br />MAINTENANCE <br /> <br />TOTAL IMPROVEMENT COSTS <br />(1982) <br /> <br />Annual Operation/Maintenance Cost <br /> <br />$ 2,000.00 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />$ 20,000.00 <br /> <br />$ 22,000.00 <br /> <br />$ 6,600.00 <br /> <br />$ 2,900.00 <br /> <br />$ -0- <br /> <br />$ 31,500.00 <br /> <br />$ 18,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.