My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01851
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01851
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:58:07 PM
Creation date
10/4/2006 10:25:25 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Golden
Stream Name
Clear Creek
Title
Major Drainageway Planning
Date
9/1/1982
Prepared For
Jefferson County
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />COST ESTIMATE - Sheet 2 <br /> <br />Reac h 1 <br /> <br />Station 885+00 to Station 900+00 <br /> <br />CONSTRUCTION - LONG TERM PLAN <br /> <br />Channel Improvement Costs <br />Channel Crossing Costs <br />Utility Relocation Costs <br /> <br />TOTAL CONSTRUCTION COSTS <br /> <br />ENGINEERING AND CONTINGENCIES (30% of Construction Costs) <br />FISCAL, LEGAL AND ADMINISTRATIVE (10% of Above Total) <br />PROPERTY ACQUISITION COSTS <br /> <br />TOTAL IMPROVEMENT COSTS <br />(1982) Long Term Plan <br /> <br />MAINTENANCE <br /> <br />Annual Operation/Maintenance Cost <br /> <br />CONSTRUCTION - INTERIM PLAN <br /> <br />Floodproofing Measures <br />Bridge Protection Costs <br /> <br />TOTAL CONSTRUCTION COSTS <br /> <br />ENGINEERING AND CONTINGENCIES (30% of Con st. Costs) <br />FISCAL, LEGAL AND ADMINISTRATIVE (10% of Above Total) <br />PROPERTY ACQUISITION COSTS <br /> <br />TOTAL IMPROVEMENT COSTS <br />(1982) Interim Pl an <br /> <br />MAINTENANCE <br /> <br />Annual Operation/Maintenance Cost <br /> <br />COST ESTIMATE - Sheet 2 <br /> <br />Reach 2 <br /> <br />Station 850+00 to Station 885+00 <br /> <br />CONSTRUCT! ON <br /> <br />$ 331,700.00 <br />$ 710,000.00 <br />$ 80,000.00 <br /> <br />$1,121,700.00 <br /> <br />$ 336,500.00 <br />$ 145,800.00 <br />$ 498,500.00 <br /> <br />Bridge Removal Costs <br />Raise Vasquez Street Bridge <br />Highline Canal Flow Restrictor <br />Raise Channel Walls <br />Util ity Relocations <br /> <br />TOTAL CONSTRUCTION COSTS <br /> <br />ENGINEERING AND CONTINGENCIES (30% of Construction Costs) <br /> <br />FISCAL, LEGAL AND ADMINISTRATIVE (10% of Above Total) <br /> <br />$2,102,500.00 <br /> <br />PROPERTY ACQUISITION COSTS <br /> <br />$ 5,600.00 <br /> <br />TOTAL IMPROVEMENT COSTS <br />(1982) <br /> <br />MAINTENANCE <br /> <br />$ 35,000.00 <br />$ 30,000.00 <br />$ 65,000.00 <br />$ 19,500.00 <br />$ 8,500.00 <br />$ -0- <br />$ 93,000.00 <br /> <br />Annual Operation/Maintenance Cost <br /> <br />$ 5,600.00 <br /> <br />C-8 <br /> <br />$ 80,000.00 <br />$200,000.00 <br />$ 5,000.00 <br />$ 50,000.00 <br />$ 10,000.00 <br /> <br />$345,000.00 <br /> <br />$103,500.00 <br />$ 44,900.00 <br /> <br />$ -0- <br /> <br />$493,350.00 <br /> <br />$ 12,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.