Laserfiche WebLink
<br />,I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br /> <br />. Anderson System under freeway to South [MI (instrument <br /> Boulder Creek (including Viele survey) <br /> pond drain). <br />. Upper Bear Creek spill at Table Mesa to [H] (limited <br /> Anderson Ditch subbasin. instrument survey) <br />. Controls on Highway 36 overs pill (includes [M] (instrument <br /> storm sewer). survey) <br />. Foothills Parkway and adjacent drainage [HI (limited <br /> network. instrument survey) <br />. Basins west of Foothills and South of Baseline [HI (limited <br /> (for basin boundaries, spills, and storm sewers instrument survey) <br /> going to Bear Creek). <br />. Foothills and Baseline storages, storm sewer, [H] (topo survey) <br /> and street spill and flow controls. <br />. Baseline to 55th Street Crossover Ditch, [HI (topo survey and <br /> culverts, adjacent roadway, tributary storm evaluate levee <br /> sewers, and likely spill area. situation) <br />. 55th Street ditch, culverts and tributary storm [M] (topo surveyor <br /> sewers. instrument survey <br /> supplementing <br /> recent construction) <br />. Wellman Ditch, tributary storm sewer, culverts, [HI (topo survey and <br /> bridges, irrigation crossings, levees, extreme evaluate where <br /> flow paths, Bear Creek diversion to South levees) <br /> Boulder Creek. <br />. Lower South Boulder Creek, Dry Creek 2, and [M] (instrument <br /> overflow area controls, storm sewers right bank survey) <br /> tributary storage controls, diversion to Valmont. <br /> <br />B. Data Collection Work <br /> <br />Obtain data and study information on storm sewers, culverts, irrigation <br />ditches, highways and major roadways, WRC study, SLA/GO on lower split, <br /> <br />V-3 <br />