My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01772
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:09:10 PM
Creation date
10/4/2006 10:20:56 PM
Metadata
Fields
Template:
Floodplain Documents
County
Pitkin
Community
Pitkin County
Stream Name
Roaring Fork River
Title
LOMR - Affected Panel 080287 8097 C, 0052 C - Case No. 98-08-035P
Date
1/7/1999
Prepared For
Pitkin County
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ . <br /> <br />2 <br /> <br />Because this revision request also affects the Town of Basalt, a separate LOMR for that community was <br />issued on the same date as this LOMR. <br /> <br />The modifications are effective as of the date shown above. The map panel(s) as listed above and as <br />modified by this letter will be used for all flood insurance policies and renewals issued for your community. <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br />Location <br /> <br />Existing BFE <br />(feet)" <br /> <br />Modified BFE <br />(feet)" <br /> <br />Approximately 4,300 feet downstream of DRGWRR <br />Approximately 3,750 feet downstream of DRGWRR <br /> <br />6,659 <br />6,667 <br /> <br />6,660 <br />6,666 <br /> <br />"Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Public notification of the proposed modified BFEs will be given in the The Aspen Times on or about <br />February 12 and February 19, 1999. A copy of this notification is enclosed. In addition, a notice of <br />changes will be published in the Federal Register. Within 90 days of the second publication in the <br />The Aspen Times, a citizen may request that FEMA reconsider the determination made by this LOMR. <br />Any request for reconsideration must be based on scientific or technical data. All interested parties are on <br />notice that, until the 9O-day period elapses, the determination to modify the BFEs presented in this LOMR <br />may itself be modified. <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents and <br />mortgage lenders, your community will serve as a repository for these new data. We encourage you to <br />disseminate the information reflected by this LOMR throughout the community, so that interested persons, <br />such as property owners, local insurance agents, and mortgage lenders, may benefit from the information. <br />We also encourage you to prepare a related article for publication in your community's local newspaper. <br />This article should describe the assistance that officials of your community will give to interested persons <br />by providing these data and interpreting the NFIP maps. <br /> <br />We will not physically revise and republish the FIRM and FIS report for your community to reflect the <br />modifications made by this LOMR at this time. When changes to the previously cited FIRM panel(s) and <br />FIS report warrant physical revision and republication in the future, we will incorporate the modifications <br />made by this LOMR at that time. <br /> <br />The floodway is provided to your community as a tool to regulate floodplain development. Therefore, the <br />floodway modifications described in this LOMR, while acceptable to FEMA, must also be acceptable to <br />your community and adopted by appropriate community action, as specified in Paragraph 60.3(d) of the <br />NFIP regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.