Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />October 19, 1981 <br />I"'\)" four <br /> <br />2. The 1980-81 legistlative cuts eliminated the Board's <br />Floodplain account; thus, we have no means to pay for <br />the increased costs. <br /> <br />3. Today, we are doubtful t.hat the flood hazard informat ion <br />and data can be completed and published. <br /> <br />4. Over $5,000 in additional engineering fees have been <br />incurred. <br /> <br />5. The loca'l governments will not have a document which <br />they can use to fulfill the requirements of the special <br />conditions as outlined in their $12,000,000 EPA Sewer <br />Grant. <br /> <br />lFl/gI <br />