My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01718
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:07:18 PM
Creation date
10/4/2006 10:18:51 PM
Metadata
Fields
Template:
Floodplain Documents
County
Montrose
Community
Montrose
Stream Name
Uncompahgre River
Title
City of Montrose Flood Control and Drainage Plan
Date
5/1/1981
Prepared For
Montrose
Prepared By
Gingery Associates, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> 100 YR. FLOOD HYDROGRAPH <br /> MONTROSE ARROYO <br /> CONFLUENCE WITH CEDER CREEK <br /> 1200 <br /> -110 '" <br />1000 \ <br /> UPSTREAM <br /> BASIN <br /> 800 RUNOFF ,--- <br /> , <br /> I , <br />_600, <br />" <br />. <br />0 ~ <br />- '" <br />. <br />0 <br />. <br />. <br />> G "-.. <br />0 coc^' <br />" <br />0400 "'- <br /> RUNOff .~ ~ <br /> ~, <br /> 200 <br /> , J -~ <br /> 0 I <br /> 0 50 '00 '50 200 250 <br /> TIME(MiNUTES 1 <br /> FIGURE 5 <br /> <br />I <br />I <br />'I <br />I <br />!I <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />!I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />HYDRAULIC ANALYSIS <br />A hydraulic analysis was completed by Hydro-Triad Ltd. in April, 1979, <br />(Reference 1) to determine water surface profiles for tnelO-ye ar,SO-year, <br />lOo-year, and 5(}O-y~dr floods on l-1.:1ntrose Arroyo, Cedar Creek and Dry Ceddf <br />Creek. These water surface elevations were computed using theHEC-1Icom - <br />puter model for backwater analysis. The culvert crossings on Montrose <br />Arroyo are insufficient to pass the lOO-year flow; consequently, during <br />such an event a ccnsiderable amount of flow would be lost from thech annel <br />to flow overland. This shallow flooding wOl.l1d flow away f~om M::Introse <br />Arroyo west and northwest to the Uncompahgre Rlver. Some of this flow <br />would pond along the east side of the D&RGW Railroad embankment between <br />South 1st and North 2nd Streets. The previous hydraulic compl.ltations were <br />carried out based on the premise that imediate1y downstream of each cross- <br />ingall spilledflowisconsideredtObebackinthechannel,andanyex- <br />cess is again shown as spilling at the next inadequate crossing. This <br />procedure....as used by f1ydro-Triad Ltd. topreventtheanJlysi> fr ombecom- <br />ing superseeded each time an upstream culvert is improved, and to illustrate <br />a conservative situation. <br />In order to evaluate existing damages, it is necessary to have the <br />floodplain and flood profiles defined for the existing conditions. Therefore, <br />Gingery Associates conducted hydraulic analyses to determine flood elevations <br />andde1ineatefloodinglimitsthatref1ecttheactualsituationthat exists <br />in Montrose. The an<l.lyses were performed ln the followingrnanner: Proceed- <br />ing in a d?wnstream direction, at thp first inadequate crossing (SOuth 12th <br />Street). cal culatinn~ wprp nude based on cl.Ilvert rating curves and existing <br />topogrdphy to determine the amount of flow lost from thech<l.nnel. Downstream <br />of the crossing the discharge in the channel was reduced by this a 001.1111. This <br /> <br />.19- <br />
The URL can be used to link to this page
Your browser does not support the video tag.