My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01687
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01687
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:49 PM
Creation date
10/4/2006 10:16:50 PM
Metadata
Fields
Template:
Floodplain Documents
County
Prowers
Community
Holly
Stream Name
Arkansas River
Title
Holly Flood Control Project
Date
11/1/1981
Prepared For
Prowers County
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />with the Federal legislation authorizing such Project. the District shall. in <br /> <br />consideration of the Government commencing the construction thereof, fulfill <br /> <br /> <br />the requirements of non-Federal cooperation specified in such legislation, to <br /> <br /> <br />wit: <br /> <br />a. The District promises and guarantees the Government that it will <br /> <br /> <br />furnish without cost to the Government all lands, easements, rights-of-way and <br /> <br /> <br />spoil disposal areas necessary for construction, maintenance and operation of <br /> <br /> <br />the Project. <br /> <br /> <br />b. The District agrees to bear the costs of all alterations and relo- <br /> <br /> <br />cations of utilities and any other community services that are required for <br /> <br /> <br />construction of the Project. <br /> <br /> <br />c. The District promises and guarantees to hold and save the United <br /> <br /> <br />States free from damages due to construction of the Project, except <br /> <br /> <br />da"",ges due to the fault or negligence of the United States or its contractors. <br /> <br /> <br />d. The District agrees to maintain and operate the Project in accordance <br /> <br /> <br />with regulations prescribed by the Secretary of the Army. <br /> <br /> <br />e. The District agrees to prevent any encroachment that would prevent <br /> <br /> <br />or restrict the flows in the existing channels. <br /> <br /> <br />f. The District agrees to prevent any encroachment on the ponding <br /> <br /> <br />areas that would decrease the capacities. <br /> <br /> <br />g. The District agrees to assume full responsibility for all Project <br /> <br /> <br />costs in excess of the Federal cost limitation of $2,000,000.00. <br /> <br /> <br />h. The District agrees to, at least annually, publicize and notify all <br /> <br /> <br />interested parties that some flooding will continue to occur due to flows <br /> <br /> <br />greater than design magnitude. <br /> <br /> <br />i. The District agrees to adopt such flood plain regulations necessary <br /> <br /> <br />to insure comoatibi1ity between future development and the degree of flood <br /> <br /> <br />protection afforded to the Project area. <br /> <br /> <br />j. The District agrees to publiCize the flood plain information con- <br /> <br /> <br />tained in Appendix 4 of the Detailed Project Report for Flood Control at Holly, <br /> <br /> <br />Colorado, and make it reid(ly available to an 'interested parties: - ' . <br /> <br /> <br />2. Upon request by the Government, the District will furnish evidence <br /> <br /> <br />of title reflecting a sufficient property interest in the flood control works to <br /> <br /> <br />protect the Government, and will furnish a certificate from its attorney that <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.