My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01687
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01687
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:49 PM
Creation date
10/4/2006 10:16:50 PM
Metadata
Fields
Template:
Floodplain Documents
County
Prowers
Community
Holly
Stream Name
Arkansas River
Title
Holly Flood Control Project
Date
11/1/1981
Prepared For
Prowers County
Prepared By
US Army Corps of Engineers
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />Drainage Structure - Sta 164 +20. <br />Size <br />Length <br />Gate <br />Inlet Structure <br />Outlet Structure <br />Inlet Invert Elevation, Feet above m.s.l. <br />Outlet Invert elevation, Feet above m.s.l. <br /> <br />3D-Inch, ~ C.M.P. <br />87 Feet <br />30 Inch, Slide <br />Concrete Apron <br />Concrete Apron and Riprap <br />3383.0 <br />3382. 0 <br /> <br />Drainage Structure-Sta 187+06. <br />Size <br />Length <br />Gate <br />Inlet Structure <br />Outlet Structure <br /> <br />Inlet Invert Elevation, Feet above m.s.l. <br />Outlet Invert Elevation, Feet above m.s.l. <br /> <br />18-Inch, ~ C.M.P. <br />83 Ft. 8-In <br />18 Inch, Flap <br />Concrete Apron <br />Concrete Headwall and <br />Riprap <br />3379.0 <br />3378.53 <br /> <br />2-06 Project Plans. The general project plan is <br />No. 2 and 3 show the stoplog closure structures at <br />with U.S. Highway 50 and the A.T. & S.F. Railroad. <br />drawings and as-built construction drawings are on <br />project sponsor. <br /> <br />shown on Plate No.1, Plate <br />the levee intersections <br />Complete sets of shop <br />file at the office of the <br /> <br />2-07 History. Construction of <br />.June'1979 and all features were <br />requirement, on 3 October 1980. <br />inspected on 13 February 1981. <br /> <br />the Holly Flood Control Project started <br />completed, except for the seeding <br />The specified seeding was completed and <br /> <br />...."1 I;' <br />..."". t..', <br />on 1:9- .' <br /> <br />2-08 Project Contracts. The Holly Flood Control Project was constructed <br />under Contract No. DACW47-79-C-0080, Levee and Related Facilities, Holly <br />Colorado, by Stannard Construction Company, Inc, P.O. Box 4064, Wichita, <br />Kansas 67204. The Contract was awarded on 19 June 1979. <br /> <br />PART II - OPERATION AND MAINTENANCE <br /> <br />CHAPTER 3 - GENERAL. <br /> <br />3-01 Regulations. Regulations for operation and maintenance of local flood <br />protection works are published in Section 208.10, Title 33 of the Code of <br />Federal Regulations. The pertinent requirements contained in these <br />regulations for the operation and maintenance of the structures are presented <br />in subsequent paragraphs of this chapter and Chapter 4. Compliance with <br />these requirements is one of the conditions ~equired of local cooperation. <br />The structures shall be continously maintained in such a manner and operated <br />at such times and for such periods as may be necessary to obtain the maximum <br />benefits. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.