Laserfiche WebLink
<br />TABLE A-4. ESTIMATED COS'1' OF CONSTRUCTION <br />KELLY ROAD DAN IMPHOVEHENTS <br /> <br />Side EmbankmE,nts <br /> <br />ql~"Elii t:[ <br /> <br />Stripping <br /> <br />4,8(;0 c.y. <br /> <br />Fill <br /> <br />:9,400 c.y. <br /> <br />Borrow <br /> <br />/7,~,ClO c.y. <br /> <br />Topsoil <br /> <br />'j ,. 2:10 c. y. <br /> <br />Seed:.ng <br /> <br />4 ac. <br /> <br />Emergency Spillway <br /> <br />Stripping <br /> <br />2,3CO c.y. <br />5,7nO c.y. <br />6,900 c.y. <br />5 ,700 c.y. <br />625,000 Ibs. <br />7,6'0 c.y. <br /> 700 l.f. <br /> 230 l.f. <br />1,5('0 c.y. <br /> 8GO c.y. <br /> 2.30 lof. <br /> <br />Fill <br /> <br />Borrow <br /> <br />Concrete <br /> <br />Reinforcing Steel <br /> <br />Fill and Frost Blanket <br /> <br />Sump Drain <br /> <br />Wall Drains <br /> <br />Excavation <br /> <br />Compacted Ba.ckfill <br /> <br />Handrail <br /> <br />Engineering and Contingencies <br /> <br />Fiscal, Legal B.nd Administrati ve Ccs'~.s <br /> <br />'IO~:'i:\.L <br /> <br />Annual ~aintenance Cost <br /> <br />'l'OTAL <br /> <br />Estimat<~d <br />Cost <br /> <br />~ 6,000 <br />., <br /> 33, ',00 <br /> 39,800 <br /> 7,800 <br /> 2,000 <br /> <br />3,500 <br /> <br />4,800 <br /> <br />5, 7G C <br /> <br />427,400 <br /> <br />312,500 <br /> <br />53,700 <br /> <br />4,600 <br /> <br />1,000 <br /> <br />3,000 <br /> <br />1,600 <br /> <br />1,900 <br />--"--908 , <) 0 0 <br />340,800 <br /> <br />__._~!f'.Cl..Q. <br />$1,306,400 <br /> <br />$ <br /> <br />1,90'0 <br />