Laserfiche WebLink
<br />TABLE A-3 (cont.) <br /> <br />(l.'~an!i t:[ <br /> <br />E. Fairmont Drive Area <br /> <br />36 - in RCP 7 2 0 1. f. <br /> <br />4fi-in RCP 925 1. f. <br /> <br />54-in RCP 185 1. f. <br /> <br />Miscel~aneous and Cleanup <br /> <br />Land Acquisition <br /> <br />1 ac. <br /> <br />Engineering and Contingencies <br /> <br />F., L., & A. Costs <br /> <br />Subtotal (E) <br /> <br />Annual Maintenance Cost <br /> <br />TOTAL ESTIMATED COST OF CONSTRUCTION <br /> <br />TOTAL ESTIMATED ANNUAL MAINTENANCE COST <br /> <br />Estimated <br />Cost <br /> <br /> 34,560 <br /> 64,750 <br /> 15,700 <br /> 8,990 <br /> 124,000- <br /> 8,000 <br /> :n,ooo <br /> 16,000 <br />$ 179,000 <br /> 1,100 <br /> <br />$4,282,000 <br /> <br />$ <br /> <br />18,700 <br />