My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01675
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:11:47 AM
Creation date
10/4/2006 10:16:14 PM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Adams
Community
Aurora
Stream Name
Westerly Creek
Title
Major Drainageway Planning
Date
2/1/1977
Prepared For
UDFCD
Prepared By
Camp Dresser & McKee
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />VII. <br /> <br />COST ES'I'I/1NrES <br /> <br />A co.st estimate of the improvement:s for each alt.ernat:iv," was <br />prepared and presented in t:he Phase h report _ '1'hese costs <br />were used in the benefit-cost analys(,s t.o determine the mos.t <br />economical alternative plan. Al'l:erna1:ive 3/\ was selE,cted in <br />the Phase A report and is presEmted in this Phase B preliminary <br />desiqn. <br /> <br />The :oasis of the Phase B cost estimau,s are described in t:he <br />following paragraphs. The detailed cost. estimat..es arEl pre- <br />~;ent,~d in Appendix A. The improvE"men1: costs by jurisdiction <br />locations are also presentEld in l\ppendix A. Cost.. estimates of <br />improvements in Lowry Air Force Base (Kelly Hoad Dam, Upper <br />Lowry Detention Pond, and flood channE,l from Havana Street: to <br />Upper Lowry Detention Pond) were prepared by the Omaha District <br />Corp.> of Engineers_ <br /> <br />Construction Costs <br /> <br />Estimated unit costs of construction of the flood control im- <br />prov'~ments were based on the est:imated unit cost..S of ~;imilar <br />construction in this area and adjus1:e,d t.o the present: da1:e, <br />(Jan'.lary, 1977). The unit cost:s used for this Phase B pre- <br />liminary design are present:ed in Appendix A. Costs for detention <br />pond:3 include clearing" grubbinq, excavation, fillincr, compactinq, <br />and '"rater handling, where requir'~d. 'rhe es1:imated costs for <br />channels include clearing, excavat:ion and refill, sOddinq, and <br />water handling. Cost estimates for box culverts include sheetinq, <br />water and traffic control, utili'l:y relocation, pavement replace- <br />ment, structural excavation and rE,fi 11, concrete, and steel <br />rein forcement. Costs for drains i.nclude excavation; backfi ll; <br />furnishing, laying and jointing pipe; manhole and access struc- <br />tures; end walls; pavement replacement for street drai.ns; and <br />clearing for cross--country drain:3. Cost.~; for rights-.of.-way <br />include land costs only. <br /> <br />~~api'::al Costs <br /> <br />Capi~al costs in this report include the estimated construction <br />cost.>; allowances for engineerinq and contingencies; and an <br />allowance for fiscal, legal and ailininistrative expenses. No <br />attempt has been made too estimatr, costs of land or ea~;ements <br />where either federal or municipal lands are i.nvolved. <br /> <br />Ever, possible precaution has been taken to include all it:ems <br />affecting construct:ion, However. the details of potential con- <br />struction problems at the t:ime of construction cannot be foreseen <br />at t:'lis time. Therefore, an allowance for such cont..ingencies <br />must be included as well as the allo",ance for engineering services <br />(design, surveys, borinqs, etc.). The ccst estimates include a <br />25 percent allowance to cover both enqineering and continqencies. <br /> <br />.-34- <br />
The URL can be used to link to this page
Your browser does not support the video tag.