My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01675
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01675
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:11:47 AM
Creation date
10/4/2006 10:16:14 PM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Adams
Community
Aurora
Stream Name
Westerly Creek
Title
Major Drainageway Planning
Date
2/1/1977
Prepared For
UDFCD
Prepared By
Camp Dresser & McKee
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'vater storasre facility (UppE',r Lo<:!ry DetE,ntion Pond) :Ear <br />flows intercepted by the ea~;t to \,'ee':: channel, (51 wLnirr.wn <br />improvements to Kelly Dam 'to recluce it.s hazard level, and <br />(6) croposed Stapleton Detention Pond to suppress storm <br />runoff flows crossing Stapleton F~r;~rt. <br /> <br />[:>elected Alternative <br /> <br />Alternative 3A was reconmlended .in t::-H~ Phase A report,. Based <br />upon our studies, 1:his l:'ecoTIut,enoed plan provides (1) an <br />adequate drainage outlet for the upper 'r,aten3hec.; (2) a <br />relief to the hazard levels of the existing storage struc- <br />tures; and (3) a reduction of the fj,ocd potential in the <br />downstream reaches of t,he \'Iester ly Cree,: basin. <br /> <br />Review of the Selected AltE,rnati.ve <br /> <br />1'he Report on Drainage Haster Plan fen \i',,,sterly Creek has <br />been reviewed by the Urban Drainage and I"lood Control District, <br />Ci ty and Cou.nty of Denver, City of ;~.u:cora, Omaha Dis1:ric.t <br />Corp3 of Engineers, Lowry Air Force LaSE and Stapleton <br />Airport. Several meet:ings had been. h,~lcl with associated <br />juriSdictions before the preliminary design was hegun. The <br />recommended alternative plan was gelwrally accepted by a.ll <br />j uri:;dictions. The conclusions from tho,' e meetings ,,,"re <br />impl,~mented and are summarized beloW', <br /> <br />Stap Leton Detention Pond: Al thoGqh ',ehe o:,tapletoYl De1:ention <br />Pond, as proposed in the Phase A report, provides more <br />benefits than its construct.ion and rnaint:E::nance costs,. <br />Stapleton Airport has a fu1:ure plan teo u~c e part of Uw pro- <br />posed detent.ion storag'e si1:e. A recornmerdati.on ~las initiated <br />by S~apleton Airport and agreed to by all juriSdictions to <br />reevaluate the proposed Staplet.on DetcE,nt.ion Pond by consider- <br />ing ':he followi nq criteria: <br /> <br />a. Use the natural detention capacL:,y u;:, to its waximum <br />extent possible. <br /> <br />b. Occasional flooding of vacant areas, parking lots, <br />airport aprons can be teolerated. <br /> <br />C' . Additional capacity under 8taplE,t.on ll,irport should be <br />considered. <br /> <br />d. ;\ny proposed improvement.s should not agg:l:'avat.e thE! <br />flooding situation in t.IlE! pruposcd :;tapleton Detention <br />Pond area. <br /> <br />e. Investigate the possibility of lncreasing the capacity <br />under Stapleton in existing culverts by imp]~oving inlet <br />conditions. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.