|
<br />I
<br />
<br />I
<br />
<br />Fri 16 Jun 1995
<br />Eff. Date 03/21/95
<br />DETAILED ESTIMATE
<br />
<br />u.s. Army Corps of Engineers
<br />Langdon Bend Alternative A3 - Nemaha County, NE
<br />FEASIBILITY ESTIMATE
<br />06. Fish and Wildlife Facilities
<br />
<br />DETAIL PAGE 11
<br />
<br />PROJECT LANGA3;
<br />
<br />1
<br />
<br />Wildlife Facilities & Sanctuary
<br />
<br />QUANTI UaM MANHOUR
<br />
<br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST
<br />
<br />I
<br />
<br />FILTER MATERIAL
<br />A crane with a 1.25cy bucket and a 2ey FE loader will place this material
<br />at a rate of 25 tons per hour.
<br />
<br /> 1. 00 17.10 0.00 0.00 17.10
<br />272.00 HR 272 4,650 0 0 4,650
<br /> 0.00 0.00 0.00 14.70 14.70
<br />6800.00 TON 0 0 0 99,960 99,960
<br /> 1.00 23.41 0.00 0.00 23.41
<br />272.00 HR 272 6,368 0 0 6,368
<br /> --------- --------- --------- -----------
<br />6800.00 TON 1,036 22,968 27,196 99,960 150,124
<br />
<br />STRUcrtJRE RIPRAP
<br />A crane with a 1. 25cy bucket and a 2 cy FE loader will install the riprap
<br />for all structures. Two laborers will be used to hand place the riprap at
<br />a rate of 25 tons per hour.
<br />Outside Equip. Cp. Heavy 1. 00 23.41 0.00 0.00 23.41
<br /> 1444.00 HR 1,444 33,804 0 0 33,804 23.41
<br />CR,ME,CWLR,LIFTING,50T,W/50 ' BOOM 0.00 0.00 54.67 0.00 54.67
<br />50 TON LIFTING CRANE W/50' BOOM 1444.00 HR 0 0 78,949 0 78,949 54.67
<br />BKT,CLAM,1-1/8CY,GEN PURP/SQNOSE 0.00 0.00 2.73 0.00 2.73
<br />1.125 cr, GEN. PURPOSE/SQUARE NO 1444.00 HR 0 0 3,948 0 3,948 2.73
<br />TRK,HWY,4X2,F250,3/4T,8600 GVW 0.00 0.00 6.41 0.00 6.41
<br />4X2 3/4-TON PICK-UP, 8600 GVW 1444.00 HR 0 0 9,249 0 9,249 6.41
<br />
<br />I
<br />
<br />OUtside Equip. Op. Heavy
<br />
<br />220.00 HR
<br />
<br />I
<br />
<br />CR,ME,CWLR,LIFTING,50T,W/50'BOOM
<br />50 TON LIFTING CRANE W/SO' BOOM 272.00 HR
<br />
<br />1
<br />
<br />BKT,CLAM,l-l/BCY,GEN PURP/SQNOSE
<br />1.125 CY, GEN. PURPOSE/SQUARE NO 272.00 HR
<br />
<br />I
<br />
<br />TRK,HWY,4X2,F250,3/4T,8600 GVW
<br />4X2 3/4-TON PICK-UP, 8600 GVW 272.00 HR
<br />
<br />Foreman
<br />
<br />I
<br />
<br />272.00 HR
<br />
<br />I
<br />
<br />LDR, FE, CRWLR, 2.00 CY
<br />REF. EP 1110-1-8
<br />2.00 CY
<br />
<br />272.00 HR
<br />
<br />OUtside Equip. Oilers
<br />
<br />I
<br />
<br />Filter Material (delivered)
<br />
<br />'I
<br />
<br />OUtside Equip. Op. Heavy
<br />
<br />'I
<br />
<br />TOTAL FILTER MATERIAL
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />'I
<br />
<br />I
<br />
<br />I
<br />
<br />EQUIP ID: MR0054
<br />
<br />CUrrency in DOLLARS
<br />
<br />LABOR ID: CIVTI'A
<br />
<br />1.00 23.41 0.00 0.00 23.41
<br />220 5,150 0 0 5,150
<br />0.00 0.00 54.67 0.00 54.67
<br /> 0 0 14, B71 0 14,871
<br />O. 00 0.00 2.73 0.00 2.73
<br /> 0 0 744 0 744
<br />0.00 0.00 6.41 0.00 6.41
<br /> 0 0 1,742 0 1,742
<br />1.00 25.00 0.00 0.00 25.00
<br />272 6,800 0 0 6,800
<br />0.00 0.00 36.17 0.00 36.17
<br /> 0 0 9,838 0 9,838
<br />
<br />CREW ID: MRONAT UPB ID: MRON93
<br />
<br />TIME 14:24:30
<br />
<br />23.41
<br />
<br />54.67
<br />
<br />2.73
<br />
<br />6.41
<br />
<br />25.00
<br />
<br />36.17
<br />
<br />17.10
<br />
<br />14.70
<br />
<br />23.41
<br />
<br />22.08
<br />
|