<br />Fri 16 Jun 1995
<br />Eff. Date 03/21/95
<br />DETAILED ESTIMATE
<br />
<br />U.S. Army Corps of Engineers
<br />PROJECT LANGAJ; Langdon Bend Alternative A3 - Nemaha Connty, NE
<br />FEASIBILITY ESTIMATE
<br />06. Fish and Wildlife Facilities
<br />
<br />TIME 14:24:30
<br />
<br />I
<br />
<br />DETAIL PAGE 7
<br />
<br />I
<br />
<br />Wildlife Facilities & Sanctuary
<br />
<br />QUANTI UOM MANHOUR
<br />
<br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST
<br />
<br />I
<br />
<br />Fish and Wildlife Facilities
<br />
<br />Wildlife Facilities & Sanctuary
<br />
<br />I
<br />
<br />CLEARING AND GRUBBING
<br />Two DBN dozers will be used to complete this work. The material will be
<br />pushed off the the side and left on site. Based on the Corps' review
<br />comment number 98 and conversations with Rich Stricker from the Corps, this
<br />warl will be completed at a rate of 0.1 acres per hour.
<br />
<br />I
<br />
<br />I
<br />
<br />OUtside Equip. Gp. Heavy 1.00 23.41 0.00 0.00 23.41
<br /> 520.00 HR 520 12,173 0 0 12,173 23.41
<br />DQZER,CWLR,CAT D-8N, (ADD BLADE) 0.00 0.00 65.12 0.00 65.12
<br />POWERSHIFI', (ADD BLADE) 520.00 HR 0 0 33,865 0 33,865 65.12
<br />BIADE, UNIVERSAL,HYDR,FOR D8 0.00 0.00 6.93 0.00 6.93
<br />BLADE, UNIVERSAL,HYDRAULIC,FOR D 520.00 HR 0 0 3,605 0 3,605 6.93
<br />TRK,HWY,4X2,F250,3/4T,8600 GVW O. 00 0.00 6.41 O. 00 6.41
<br />4X2 3/4-TON PICK-UP, 8600 GVW 260.00 HR 0 0 1,665 0 1,665 6.41
<br />Foreman 1.00 25.00 0.00 0.00 25.00
<br /> 260.00 HR 260 6,500 0 0 6,500 25.00
<br />Outside Laborer (Semi-Skilled) 1. 00 9.72 0.00 0.00 9.72
<br /> 520.00 HR 520 5,053 0 0 5,053 9.72
<br />CHAINSAW, 31" BAR 0.00 0.00 1.55 0 .00 1.55
<br />CHAINSAW - 31" BAR 520.00 HR 0 0 808 0 808 1.55
<br /> --------- --------- --------- -----------
<br />TOTAL CLEARING AND GRUBBING 26.00 AC 1,300 23,726 39,943 0 63,669 2448.80
<br />
<br />I
<br />
<br />,I
<br />,
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />STRIP & STOCKPILE TOPSOIL
<br /> Two D8N dozers will complete this work at a rate of 225cy per hr. The
<br /> material will be pushed off the the side and stockiled for use later.
<br /> Outside Equip. Cp. Heavy 1.00 23.41 0.00 0 .00 23.41
<br /> 373.33 HR 373 8,740 0 0 8,740 23.41
<br /> DOZER,CWLR,CAT D-8N, (ADD BLADE) 0.00 0.00 65.12 0.00 65.12
<br /> POWERSHIFI' , (ADD BLADEl 373.33 HR 0 0 24,313 0 24,313 65.12
<br /> BLADE, UNIVERSAL,HYDR, FOR D8 0.00 0.00 6.93 0.00 6.93
<br /> BLADE, UNIVERSAL, HYDRAULIC, FOR 0 373.33 HR 0 0 2,588 0 2,588 6.93
<br /> TRK,HWY,4X2,F250,3/4T,8600 GVW 0.00 0.00 6.41 0.00 6.41
<br /> 4X2 3/4-TON PICK-UP, 8600 GVW 186.67 HR 0 0 1,196 0 1,196 6.41
<br />
<br />I
<br />
<br />II
<br />I
<br />
<br />.1
<br />
<br />I
<br />
<br />LABOR ID: CIVTTA
<br />
<br />EQUIP ID: MR0054
<br />
<br />CUrrency in DOLLARS
<br />
<br />CREW ID: MRONAT
<br />
<br />UPB ID: MRON93