Laserfiche WebLink
<br />'. <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br />DETAILED ESTIMATE <br /> <br />U.S. Army Corps of Engineers <br />PROJECT LANGAJ; Langdon Bend Alternative A3 - Nemaha Connty, NE <br />FEASIBILITY ESTIMATE <br />06. Fish and Wildlife Facilities <br /> <br />TIME 14:24:30 <br /> <br />I <br /> <br />DETAIL PAGE 7 <br /> <br />I <br /> <br />Wildlife Facilities & Sanctuary <br /> <br />QUANTI UOM MANHOUR <br /> <br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST <br /> <br />I <br /> <br />Fish and Wildlife Facilities <br /> <br />Wildlife Facilities & Sanctuary <br /> <br />I <br /> <br />CLEARING AND GRUBBING <br />Two DBN dozers will be used to complete this work. The material will be <br />pushed off the the side and left on site. Based on the Corps' review <br />comment number 98 and conversations with Rich Stricker from the Corps, this <br />warl will be completed at a rate of 0.1 acres per hour. <br /> <br />I <br /> <br />I <br /> <br />OUtside Equip. Gp. Heavy 1.00 23.41 0.00 0.00 23.41 <br /> 520.00 HR 520 12,173 0 0 12,173 23.41 <br />DQZER,CWLR,CAT D-8N, (ADD BLADE) 0.00 0.00 65.12 0.00 65.12 <br />POWERSHIFI', (ADD BLADE) 520.00 HR 0 0 33,865 0 33,865 65.12 <br />BIADE, UNIVERSAL,HYDR,FOR D8 0.00 0.00 6.93 0.00 6.93 <br />BLADE, UNIVERSAL,HYDRAULIC,FOR D 520.00 HR 0 0 3,605 0 3,605 6.93 <br />TRK,HWY,4X2,F250,3/4T,8600 GVW O. 00 0.00 6.41 O. 00 6.41 <br />4X2 3/4-TON PICK-UP, 8600 GVW 260.00 HR 0 0 1,665 0 1,665 6.41 <br />Foreman 1.00 25.00 0.00 0.00 25.00 <br /> 260.00 HR 260 6,500 0 0 6,500 25.00 <br />Outside Laborer (Semi-Skilled) 1. 00 9.72 0.00 0.00 9.72 <br /> 520.00 HR 520 5,053 0 0 5,053 9.72 <br />CHAINSAW, 31" BAR 0.00 0.00 1.55 0 .00 1.55 <br />CHAINSAW - 31" BAR 520.00 HR 0 0 808 0 808 1.55 <br /> --------- --------- --------- ----------- <br />TOTAL CLEARING AND GRUBBING 26.00 AC 1,300 23,726 39,943 0 63,669 2448.80 <br /> <br />I <br /> <br />,I <br />, <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />STRIP & STOCKPILE TOPSOIL <br /> Two D8N dozers will complete this work at a rate of 225cy per hr. The <br /> material will be pushed off the the side and stockiled for use later. <br /> Outside Equip. Cp. Heavy 1.00 23.41 0.00 0 .00 23.41 <br /> 373.33 HR 373 8,740 0 0 8,740 23.41 <br /> DOZER,CWLR,CAT D-8N, (ADD BLADE) 0.00 0.00 65.12 0.00 65.12 <br /> POWERSHIFI' , (ADD BLADEl 373.33 HR 0 0 24,313 0 24,313 65.12 <br /> BLADE, UNIVERSAL,HYDR, FOR D8 0.00 0.00 6.93 0.00 6.93 <br /> BLADE, UNIVERSAL, HYDRAULIC, FOR 0 373.33 HR 0 0 2,588 0 2,588 6.93 <br /> TRK,HWY,4X2,F250,3/4T,8600 GVW 0.00 0.00 6.41 0.00 6.41 <br /> 4X2 3/4-TON PICK-UP, 8600 GVW 186.67 HR 0 0 1,196 0 1,196 6.41 <br /> <br />I <br /> <br />II <br />I <br /> <br />.1 <br /> <br />I <br /> <br />LABOR ID: CIVTTA <br /> <br />EQUIP ID: MR0054 <br /> <br />CUrrency in DOLLARS <br /> <br />CREW ID: MRONAT <br /> <br />UPB ID: MRON93 <br />