Laserfiche WebLink
<br />II <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br />DETAILED ESTIMATE <br /> <br />PROJECT LANGA3: <br /> <br />u.s. Army Corps of Engineers <br />Langdon Bend Alternative A3 - Nemaha County, NE <br />FEASIBILITY ESTIMATE <br />01. Lands and Damages <br /> <br />TIME 14 :24 :30 <br /> <br />I <br /> <br />DETAIL PAGE 6 <br /> <br />I <br /> <br />Acquisitions <br /> <br />QUANTI UOM MANHOUR <br /> <br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST <br /> <br />I <br /> <br />Lands and Damages <br />This cost was provided by the Corps and includes $835,000 for aquisition <br />and $60,000 for administration costs related to aquisition <br /> <br />I <br /> <br />Acquisitions <br /> <br />I <br /> <br />ACquisition Costs 0.00 835000.00 0.00 0.00 835000.00 <br /> 1. 00 LS 0 835,000 0 0 835,000 835000.00 <br />Administration Acquisition Costs 0.00 60000.00 0.00 0.00 60000.00 <br /> 1.00 LS 0 60,000 0 0 60,000 60000.00 <br /> --------- --------- --------- ----------- <br />TOTAL Acquisitions 0 895,000 0 0 895,000 <br /> <br />I <br /> <br />I <br /> <br />TOTAL Lands and Damages <br /> <br />1.00 EA <br /> <br />o 895,000 0 0 895,000895000.00 <br /> <br />I <br /> <br />,I <br /> <br />. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />,. <br /> <br />I <br /> <br />II <br />I <br /> <br />lABOR ID: CIVTrA <br /> <br />EQUIP ID: MR0054 <br /> <br />Currency in DOLLARS <br /> <br />CREW ID: MRONAT UPB ID: MRON93 <br />