Laserfiche WebLink
<br />II <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br />DETAILED ESTIMATE <br /> <br />PROJECI' LANGA3: <br /> <br />u. s. Army Corps of Engineers <br />Langdon Bend Alternative A3 - Nemaha County, NE <br />FEASIBILITY ESTIMATE <br />project Distributed Costs <br /> <br />TIME 14:24:30 <br /> <br />DETAIL PAGE 3 <br /> <br />I <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />I <br /> <br />Prime Contractor <br /> <br />QUANTI UOM MANHOUR <br /> <br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />I <br /> <br />I <br /> <br />GRADER, MOTOR, ARTIe, CAT 12-G 0.00 0 .00 8.58 0.00 8 .58 <br />REF. EP 1110-1-8 8.00 HR 0 0 69 0 69 8.58 <br />ARTICULATED FRAME, POWERSHIFT <br />CRANE. MECH, TRK MTD, SOT/ISO'BOOM 0.00 0.00 24.84 0.00 24.84 <br />REF. EP 1110-1-8 8.00 HR 0 0 199 0 199 24.84 <br />50 TON WITH 150' BOOM <br />HYD EXCAV, CRWLR . 3.125CY BKT 0.00 0.00 32.92 0.00 32.92 <br />REF. EP 1110-1-8 16.00 HR 0 0 527 0 527 32.92 <br />3 . 125 CY BUCKET <br />Small Tools 0.00 0.00 0.43 0.00 0.43 <br /> 8.00 HR 0 0 3 0 3 0.43 <br />OUtside Equip. Operators, Oilers 1. 00 17.10 0.00 0.00 17.10 <br /> 8.00 HR 8 137 0 0 137 17.10 <br />BKT,CLAM,l-1/8CY,GEN PURP/SQNOSE 0.00 0.00 0.99 0.00 0.99 <br />REF. EP 1110-1-B B.OO HR 0 0 8 0 8 0.99 <br />1.125 CY. GEN. PURPOSE/SQUARE NO <br />SE <br />LDR,FE, CRWLR. 2.00 CY 0.00 0.00 8.27 0.00 8.27 <br />REF. EP 1110-1-8 8.00 HR 0 0 66 0 66 8.27 <br />2.00 CY <br />supervisor 1. 00 23.10 0.00 0.00 23.10 <br /> 8.00 HR 8 185 0 0 185 23.10 <br />OUtside Truck Dr. Heavy 1.00 19.23 0.00 0.00 19.23 <br /> 160.00 HR 160 3,076 0 0 3,076 19.23 <br />TRK. 1lWY. 44,300 GVW, 3 AXLE 0.00 0.00 28.47 0.00 28.47 <br />44,300 GVW, 3 AXLE 160.00 HR 0 0 4,556 0 4,556 28.47 <br />TRK TRLR, LOWBOY, 75 TON, 3 AXLE 0.00 0.00 8.66 0.00 8.66 <br />75 TON. 3 AXLE 160.00 IIR 0 0 1,385 0 1,385 8.66 <br />Grade Checker 1.00 12.86 0.00 0.00 12.86 <br /> 8.00 HR 8 103 0 0 103 12.86 <br /> --------- --------- --------- ----------- <br />TOTAL Demobilization 1. 00 HRS 288 5,620 7,615 0 13,235 13234.95 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />,I <br /> <br />I <br /> <br />I <br /> <br />,I <br />, <br />I <br /> <br />I <br /> <br />I <br /> <br />II <br /> <br />II <br />I <br /> <br />LABOR ID: CIVTI'A <br /> <br />EQUaP ID: MR0054 <br /> <br />Currency in OOLLARS <br /> <br />CREW ID: MRONAT UPB ID: MRON93 <br />