Laserfiche WebLink
<br />I <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br />DETAILED ESTIMATE <br /> <br />I <br /> <br />I <br /> <br />Prime Contractor <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />II <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />LABOR ID; CIV'l'TA <br /> <br />u. S. Army Corps of Engineers <br />Langdon Bend Alternative A3 - Nemaha County, NE <br />FEASIBILITY ESTIMATE <br />project Distributed Costs <br /> <br />PROJECT LANGA3: <br /> <br />BKT,CLAM,1-1/8CY,GEN PURP/SQNOSE <br />REF. EP 1110-1-8 <br />1.125 cr, GEN. PURPOSE/SQUARE NO <br />SE <br /> <br />LDR, FE, CRWLR, 2.00 CY <br />REF. EP 1110-1-8 <br />2.00 CY <br /> <br />Supervisor <br /> <br />OUtside Truck Dr. Heavy <br /> <br />TRK, HWY, 44,300 GVW, 3 AXLE <br />44,300 GVW, 3 AXLE <br /> <br />TRK TRLR,LOWBOY, 75 TON, 3 AXLE <br />75 TON, 3 AXLE <br /> <br />Grade Checker <br /> <br />TOTAL Mobilization <br /> <br />Demobilization <br /> <br />Outside Equip. Cp. Heavy <br /> <br />DOZER,CWLR,CAT D-BN, (ADD BLADE) <br />REF. EP 1110-1-8 <br />POWERSHIFT (ADD BLADE) <br /> <br />BLADE, UNlVERSAL,HYDR,FOR D8 <br />REF. EP 1110-1-8 <br />BLADE, UNlVERSAL,HYDRAULIC, FOR <br />08 <br /> <br />TRK,HWY.4X2.F250,3/4T,B600 GVW <br />4X2 3/4-TON PICK-UP, 8600 GVW <br /> <br />Foreman <br /> <br />Outside Laborer {Semi-Skilled} <br /> <br />EQUIP ID: MR0054 <br /> <br />QUANTI UOM MANHOUR. <br /> <br />8.00 HR <br /> <br />8.00 HR <br /> <br />8.00 HR <br /> <br />160.00 HR <br /> <br />160.00 HR <br /> <br />160.00 HR <br /> <br />8.00 HR <br /> <br />1. 00 HRS <br /> <br />72.00 HR <br /> <br />40.00 HR <br /> <br />40.00 HR <br /> <br />8.00 HR <br /> <br />8.00 HR <br /> <br />24.00 HR <br /> <br />Currency in DOLLARS <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />1. 00 <br />8 <br /> <br />1.00 <br />160 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />1. 00 <br />8 <br /> <br />288 <br /> <br />1. 00 <br />72 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />1.00 <br />8 <br /> <br />1. 00 <br />24 <br /> <br />TIME 14:24:30 <br /> <br />DETAIL PAGE 2 <br /> <br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />23.10 <br />185 <br /> <br />19.23 <br />3,076 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />12.86 <br />103 <br /> <br />5,620 <br /> <br />23.41 <br />1,686 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />25.00 <br />200 <br /> <br />9.72 <br />233 <br /> <br />0.99 <br />8 <br /> <br />8.27 <br />66 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />28.47 <br />4,556 <br /> <br />8.66 <br />1,385 <br /> <br />0.00 <br />o <br /> <br />7,615 <br /> <br />0.00 <br />o <br /> <br />16.43 <br />657 <br /> <br />2_36 <br />94 <br /> <br />6.41 <br />51 <br /> <br />0_00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />0.99 <br />8 <br /> <br />0.99 <br /> <br />8.27 <br />66 <br /> <br />8.27 <br /> <br />23.10 <br />185 <br /> <br />23.10 <br /> <br />19.23 <br />3,076 <br /> <br />19.23 <br /> <br />28.47 <br />4,556 <br /> <br />28.47 <br /> <br />8.66 <br />1,385 <br /> <br />8.66 <br /> <br />12.86 <br />103 <br /> <br />12.86 <br /> <br />o <br /> <br />13234.95 <br /> <br />13,235 <br /> <br />23.41 <br />1,686 <br /> <br />23.41 <br /> <br />16.43 <br />657 <br /> <br />16.43 <br /> <br />2.36 <br />94 <br /> <br />2.36 <br /> <br />6.41 <br />51 <br /> <br />6.41 <br /> <br />25_00 <br />200 <br /> <br />25.00 <br /> <br />9.72 <br />233 <br /> <br />9.72 <br /> <br />CREW ID: MRONAT UPB ID: MRON93 <br />