Laserfiche WebLink
<br />I <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br /> <br />PROJECT LANGA3: <br /> <br />4 <br /> <br />I <br /> <br />u. S. Army Corps of Engineers <br />Langdon Bend Alternative A3 Nemaha COW1ty, NE <br /> <br />TIME 14:24:30 <br /> <br />FEASIBILITY ESTIMATE <br />** PROJECT INDIREct' SUMMARY - LEVEL 1 "'* <br /> <br />SUMMARY PAGE <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />I <br /> <br />QUANTITY UOM <br /> <br />DIRECT OVERHEAD HOME OFC <br /> <br />PROFIT <br /> <br />BOND TOTAL COST UNIT COST <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />I <br /> <br />01 Lands and Damages <br />06 Fish and Wildlife Facilities <br />30 Planning, Engineering and Design <br />31 Construction Management <br /> <br />I <br /> <br />Langdon Bend Alternative A3 <br /> <br />I <br /> <br />CONTINGENCY <br /> <br />TOTAL INCL OWNER COSTS <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />II <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />LABOR 1D: CIVTI'A <br /> <br />EQUIP 1D: MR0054 <br /> <br />1.00 EA 895,000 0 0 0 0 895,000 895000.00 <br />1.00 EA 2,325,038 283,533 123,004 198,122 21,047 2,950,743 2950743 <br />1.00 EA 177,045 0 0 0 0 177,045 177045.00 <br />1.00 EA 212,454 0 0 0 0 212,454 212454.00 <br /> ----------- --------- --------- --------- --------- ----------- <br />1.00 EA 3,609,537 283,533 123,004 198,122 21,047 4,235,242 4235242 <br /> 590,149 <br /> ----------- <br /> 4,825,391 <br /> <br />CUrrency in DOLLARS <br /> <br />CREW ID: MRONAT UPB ID: MRON93 <br />