Laserfiche WebLink
<br />,I <br />I <br /> <br />II <br />I <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br />DETAILED ESTIMATE <br /> <br />PROJEcr LANGAl: <br /> <br />u.s. Army Corps of Engineers <br />Langdon Bend Alternative A1 - Nemaha County, NE <br />FEASIBILITY ESTIMATE <br />project Distributed Costs <br /> <br />TIME 14:22:01 <br /> <br />DETAIL PAGE 3 <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />Prime Contractor <br /> <br />QUANTI UOM MANHOUR <br /> <br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />'I <br /> <br />I <br /> <br />GRADER, MOTOR, ARTIe, CAT 12-G 0.00 0.00 8.58 0.00 8.58 <br />REF, EP 1110-1-8 8.00 HR 0 0 69 0 69 8.58 <br />ARTICULATED FRAME, POWERSHIFT <br />CRANE, MECH, TRK MTD, SOT/ISO'BooM 0, 00 0.00 24.84 0.00 24.84 <br />REF, EP 1110-1-8 B.OO HR 0 0 199 0 199 24.84 <br />50 TON WITH 150' BOOM <br />HYD EXCAV, CRWLR , 3.125CY BKT 0.00 0.00 32.92 0.00 32.92 <br />REF. EP 1110-1-8 8.00 HR 0 0 263 0 263 32.92 <br />3.125 CY BUCKET <br />Small Tools 0.00 0.00 0.43 0.00 0.43 <br /> 8.00 HR 0 0 3 0 3 0.43 <br />Outside Equip_ Operators, Oilers 1.00 17.10 0.00 0.00 17.10 <br /> 8.00 HR 8 137 0 0 137 17.10 <br />BKT,CLAM,1-1/8CY,GEN PURP/SQNOSE 0.00 0.00 0.99 0.00 0.99 <br />REF, EP 1110-1-8 8.00 HR 0 0 8 0 8 0.99 <br />1.125 C'l, GEN, PURPOSE/SQUARE NO <br />SE <br />LDR,FE, CRWLR , 2.00 C'l 0.00 0.00 8.27 0.00 8.27 <br />REF, EP 1110-1-8 8.00 HR 0 0 66 0 66 8.27 <br />2.00 C'l <br />Supervisor 1.00 23.10 0.00 0.00 23.10 <br /> 8.00 HR 8 185 0 0 185 23.10 <br />Outside Truck Dr. Heavy 1. 00 19.23 0.00 0.00 19.23 <br /> 112.00 HR 112 2,153 0 0 2,153 19.23 <br />TRK, HWY, 44,300 GVW, 3 AXLE 0.00 0.00 28.47 0.00 28.47 <br />44,300 GVW, 3 AXLE 112.00 HR 0 0 3,189 0 3,189 28.47 <br />TRK TRLR, LOWBOY, 75 TON, 3 AXLE 0.00 0.00 8.66 0.00 8.66 <br />75 TON, 3 AXLE 112.00 HR 0 0 969 0 969 8.66 <br />Grade Checker 1.00 12.86 0.00 0.00 12.86 <br /> 8.00 HR 8 103 0 0 103 12.86 <br /> --------- --------- --------- ----------- <br />TOTAL Demobilization 1. 00 HRS 224 4,322 5,269 0 9,591 9591.22 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />il <br />il <br /> <br />LABOR ID: CIVTl'A <br /> <br />EQUIP ID: MR0054 <br /> <br />CUrrency in DOLLARS <br /> <br />CREW ID: MRONAT UPB ID: MRON93 <br />