Laserfiche WebLink
<br />I <br /> <br />Fri 16 Jun 1995 <br />Eff. Date 03/21/95 <br />DETAILED ESTIMATE <br /> <br />PROJECT LANGAl: <br /> <br />u.s. Army Corps of Engineers <br />Langdon Bend Alternative Al - Nemaha County. NE <br />FEASIBILITY ESTIMATE <br />Project Distributed Costs <br /> <br />TIME 14:22:01 <br /> <br />I <br /> <br />DETAIL PAGE :2 <br /> <br />------------------------------------------------------------------------------------------------------------------------------- <br /> <br />I <br /> <br />Prime Contractor <br /> <br />QUANTI UOM MANHOUR <br /> <br />LABOR EQUIPMNT MATERIAL TOTAL COST UNIT COST <br /> <br />------------------------------------------------------------------------------------------------------------ <br /> <br />I <br /> <br />BKT,CLAM,1-1/8CY,GEN PURP!SQNOSE 0.00 0.00 0.99 0.00 0.99 <br />REF, EP 1110-1-8 B.OO HR 0 0 8 0 8 0.99 <br />1.125 cr, GEN, PURPOSE/SQUARE NO <br />SE <br />LDR,FE, CRWLR, 2.00 cr 0.00 0.00 8.27 0.00 8.27 <br />REF, EP 1110-1-8 8.00 HR 0 0 66 0 66 8.27 <br />2.00 cr <br />Supervisor 1. 00 23.10 0.00 0.00 23.10 <br /> 8.00 HR 8 185 0 0 185 23.10 <br />OUtside Truck Dr. Heavy 1.00 19.23 0.00 0.00 19.23 <br /> 112.00 HR 112 2,153 0 0 2,153 19.23 <br />TRK, HWY, 44,300 GVW, 3 AXLE 0.00 0.00 28.47 0.00 28.47 <br />44,300 GVW, 3 AXLE 112.00 HR 0 0 3,189 0 3,189 28.47 <br />TRK TRLR, LOWBOY, 75 TON, 3 AXLE 0.00 0.00 8.66 0.00 8.66 <br />75 TON, 3 AXLE 112.00 HR 0 0 969 0 969 8.66 <br />Grade Checker 1. 00 12.86 0.00 0, 00 12.86 <br /> 8.00 HR 8 103 0 0 103 12.86 <br /> --------- --------- --------- ----------- <br />TOTAL Mobilization 1.00 HRS 224 4,322 5,269 0 9,591 9591.22 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I, <br /> <br />II <br />il <br /> <br />Demobilization <br /> <br />56.00 HR <br /> <br />1.00 <br />56 <br /> <br />23.41 <br />1,311 <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />23.41 <br />1,311 <br /> <br />23.41 <br /> <br />OUtside Equip. Op. Heavy <br /> <br />I <br /> <br />DOZER,CWLR,CAT D-8N, (ADD BLADE) <br />REF. EP 1110-1-8 <br />POWERSHIFT (ADD BLADE) <br /> <br />o <br /> <br />16.43 <br />394 <br /> <br />16.43 <br /> <br />24.00 HR <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />16.43 <br />394 <br /> <br />0.00 <br /> <br />I <br /> <br />BLADE, UNIVERSAL,HYDR,FOR DB <br />REF. EP ~~~0-~-8 <br /> <br />57 <br /> <br />0.00 <br />o <br /> <br />2.36 <br />57 <br /> <br />2.36 <br /> <br />24.00 HR <br /> <br />0.00 <br />o <br /> <br />0.00 <br />o <br /> <br />2.36 <br /> <br />BLADE. UNIVERSAL. HYDRAULIC, FOR <br />D8 <br /> <br />I <br />II <br /> <br />8.00 HR <br /> <br />0.00 0.00 6.41 0.00 6.41 <br />0 0 51 0 51 <br />1.00 25.00 0.00 0.00 25.00 <br />8 200 0 0 200 <br />1. 00 9.72 0.00 0.00 9.72 <br />2. 233 0 0 233 <br /> <br />6.41 <br /> <br />TRK,HWY,4X2,F250,3/4T,8600 GVW <br />4X2 3/4-TON PICK-UP, 8600 GVW <br /> <br />8.00 HR <br /> <br />Foreman <br /> <br />25.00 <br /> <br />I <br /> <br />Outside Laborer {Semi-Skilled} <br /> <br />24.00 HR <br /> <br />9.72 <br /> <br />I <br /> <br />LABOR IO: CIV'I"l'A <br /> <br />EQUIP IO: MR0054 <br /> <br />CUrrency in DOLLARS <br /> <br />CREW IO: MRONAT UPB ID: MRON93 <br />