Laserfiche WebLink
<br />II <br /> <br />I <br />I <br />II <br />il <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Item <br /> <br />V-5 <br /> <br />TABLE V-I <br />UN IT COST TABLE <br /> <br />Unit Cost <br /> <br />Earthwork <br />General excavation <br />General backfill <br />Structural excavation <br />Structural backfi 11 <br />Embankment construction <br />Imported fi 11 <br />Topsoil and seeding <br />Sod <br />Sc raper <br />Comp ac tor <br />Dozer <br /> <br />Eros i on Control <br />Rlprap Type L <br />Ri prap Type M <br />Ri prap Tyep H <br />Filter materi al <br />Grouted riprap <br />Concrete rubble <br /> <br />Structural Improvements <br />Bridge construction <br />Concrete <br />Pavement removal <br />Curb and gutter removal <br />Paving <br />Base course <br />12-inch CMP <br />18- inch CMP <br />24-inch CMP <br />48-inch CMP <br />60-inch CMP <br /> <br />Utility Relocation <br />12-1nch water <br />18- inch water <br />60- inch RCP <br />Telephone ducts (small) <br />Electrical ducts (small) <br />6-inch sanitary <br />8-inch sanitary <br />12-inch sanitary <br />21-inch sanitary <br />27-inch sanitary <br /> <br />Miscellaneous Items <br />Malntenance path <br />Barbed wire fence <br />Building demolition <br /> <br />TABLE V-2 <br />RIGHT-OF-WAY ACQUISITION COSTS <br /> <br />$ 3.00/cy <br />3.00/cy <br />8.00/cy <br />17.00/cy <br />1. 50/ cy <br />19.00/cy <br />20,000/ acre <br />1. 00/ sf <br />200.00/hr <br />80.00/hr <br />100.00/hr <br /> <br />Channel Right-of-Way <br /> <br />Costs <br /> <br />Undeveloped land currently used as open space <br />Undeveloped land in subdivisions <br />Single family lots <br />Single family homes and lots <br />Apartment units <br /> <br />$0.50 per square foot <br />1.61 per square foot <br />7.00 per square foot <br />80,OOO/each <br />40,OOO/each <br /> <br />32.00/ cy <br />41. OO/cy <br />50.00/cy <br />18.00/cy <br />35.00/sy <br />30.00/cy <br /> <br />Temporary Construction Easement <br />Undeveloped land currently used as open space <br />Undeveloped land in subdivisions <br /> <br />$0.25 per square foot <br />0.80 per square foot <br /> <br />65.00/sf <br />350.00/cy <br />3.00/sy <br />3.00/1f <br />3.45/sy-in <br />23.00/cy <br />20.00/1f <br />25.00/lf <br />35.00/lf <br />70.00/1 f <br />85.00/lf <br /> <br />Other Items <br />Trailer court relocation <br /> <br />6.00 per square foot <br /> <br />Operation and Maintenance Costs <br />Operation and maintenance estimates were derived from Urban Drainage & <br />Flood Control District information. The estimates include not only regular <br />operation and maintenance expenses but also minor emergency repairs ex- <br />pected on an infrequent basis. The estimates include three mowings, ferti- <br />lization, five cleanings, routine revegetation, and repairs. The informa- <br />tion on operation and maintenance costs is presented in Table V-3. <br /> <br />25.00/lf <br />40.00/lf <br />120.00/lf <br />10. 00/1 f <br />1O.00/lf <br />13.00/1f <br />17.00/lf <br />25.00/lf <br />43.00/lf <br />55.00/1f <br /> <br />70.00/1f <br />3.50/1 f <br />2,OOO/ea <br />