Laserfiche WebLink
<br />.' <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />COLORADO WATER CONSERVATION BOARD <br /> <br />Flood Control and Floodplain Management Section <br /> <br />A. Flood Emergency Operations <br /> <br />1. Projection of peak discharge from available data. <br />2. Interpretation of actual or potential magnitude of a <br />flood event. <br />3. Determination of flood travel times. depths, <br />velocities. and flooded areas. <br />4. Estimation of actual or projected flood damages. <br />S. Recommendation of governmental assistance programs. <br />6. Recomendation of best options for preventive <br /> <br />measures. <br />7. Technical assistance in the construction of <br />emergency protection measures. <br /> <br />B. Flood Type and Magnitude of Event Criteria <br /> <br />Type of Flood Probable General <br />Flood Season Frequency Rule <br />Ice Jam March-May O-lO-year S-year <br />Snowmelt May-July D-SO-year lO-year <br />General Rainstorm May-October O-lOO-year SO-year <br />Thunderstorm July-October O-SOO-year lOO-year <br />Failure of Manmade Jan-December O-SOOO-year lOOO-year <br />Structures <br /> <br />198 <br />feo <br /> <br />EXHIBIT 1 <br />