Laserfiche WebLink
<br />2 <br /> <br />3. Reevaluation of 100-year flood plain and floodway reflecting the pro- <br />posed channel improvements. <br /> <br />4. Analysis of damages for the existing flooding conditions. <br /> <br />5. Cost estimation of selected improvements. <br /> <br />6. Preparation of report suitable to present to Wester and Company, Inc., <br />the City of Colorado Springs, El Paso County, and FEMA evaluating <br />the feasibility of this project from the standpoint of economics and <br />the effec t on pub 1 i c health and safety, using concepts as put forth <br />in Reference 6 (below). <br /> <br />Technical Information Review <br />During the course of this study, the following references were reviewed <br />for their technical content: <br /> <br />1. <br /> <br />Preliminary Flood Insurance Studies for <br />Springs, and El Paso County, Colorado. <br />Agency, October, 1983. <br /> <br />the City of Colorado <br />Federal Emergency Management <br /> <br />2. Fountain Creek and West Drainage Areas, Master Drainage Plan, United <br />Western Engineers, May, 1975. <br /> <br />3. Red Rock Canyon Shopping Center Feasibility Analysis, Mile-Hi <br />Engineering, Inc., October, 1983. <br /> <br />4. Preliminary Site Layout, Safeway Store at 3175 West Colorado Avenue, <br />Colorado Springs, Colorado, July, 1984. <br /> <br />5. Property Survey, Red Rock Canyon Shopping Center, Colorado Springs, <br />Colorado, Columbine Engineering, May, 1984. <br /> <br />6. Fountain Creek Watershed North of Pueblo, Colorado, Reconnaissance, <br />Progress Report, May 1984, U.S. Army Corps of Engineers, Albuquerque <br />District. <br />