My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01479
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:53 PM
Creation date
10/4/2006 10:03:50 PM
Metadata
Fields
Template:
Floodplain Documents
County
El Paso
Community
Colorado Springs
Stream Name
Fountain Creek
Title
Fountain Creek Channelization Feasibility Study
Date
12/1/1984
Prepared For
Wester & Company
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />16 <br /> <br />contents of this report with the appropriate responsible departments, <br />seeking confirmation with the conclusions and recommendations con- <br />tained herein, requesting approval of the 404 Permit application <br />from appropri ate departments of ci ty government, and requesti ng <br />recommmendations to appropriate other administrative and legislative <br />branches of government so as to facilitate implementation of the <br />proposed improvements determined to be economically feasible and in <br />compl iance with the study prepared by the Corps of Engineers and <br />FEt1A. <br /> <br />2. Base maps for the preliminary design drawings should be compiled. <br />It is suggested that the aerial topographic mapping contained in the <br />Fountain Creek Master Planning Study, supplemented with field sur- <br />veying information, as necessary, be used. <br /> <br />3. Site planning previously carried out for the new Safeway Store <br />should be modified to reflect the channel improvements as ascer- <br />tained and concluded herein to be economically beneficial and <br />feasible. <br /> <br />4. Discussions with the U.S. Army Corps of Engineers, informing the <br />Corps as to the supplemental facts as discovered herein, advising <br />the Corps of the proposed construction to the Center and the addi- <br />tional improvements to the 31st Street Bridge and requesting <br />favorable consideration of the owner's request of the issuance of a <br />404 Permit, the application form for which shall be filed immediately. <br />
The URL can be used to link to this page
Your browser does not support the video tag.