My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01479
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:02:53 PM
Creation date
10/4/2006 10:03:50 PM
Metadata
Fields
Template:
Floodplain Documents
County
El Paso
Community
Colorado Springs
Stream Name
Fountain Creek
Title
Fountain Creek Channelization Feasibility Study
Date
12/1/1984
Prepared For
Wester & Company
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />14 <br /> <br />Table 4. Cost Estimate of Selected Improvements <br />Red Rock Canyon Feasibility Study <br /> <br /> Item <br />1. Concrete channel <br /> linings* (both sides) <br />2. Rip-rap channel <br /> protection, 2500 feet <br />3. 31st Street Bridge <br /> modifications** <br />4. Camp Creek Outfall <br /> modification <br />5. Utility relocations <br />6. Hater Diversion <br /> Structure <br /> <br />Engineering & Contingency <br /> <br />Quantity Unit <br /> <br />2,500 lineal feet $400/l.f. <br /> <br />29,600 cubic yards $ 24/c.y. <br /> <br />7,200 square feet $ 40/sq. ft. <br /> <br />1 1 ump sum <br />1 1 ump sum <br />1 lump sum <br /> Sub- Total <br /> 15% <br /> TOTAL <br /> U~J!T COST TOTAL <br /> <br />Cost <br />($ million) <br /> <br />1.00 <br /> <br />.71 <br /> <br />.29 <br /> <br />.06 <br /> <br />.10 <br /> <br />.10 <br /> <br />2.26 <br /> <br />.33 <br /> <br />2.59 <br />$1,036/l.f. <br /> <br />* Refer to Figure 3. <br />** Based upon replacement of the existing structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.