My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01459
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:07:19 PM
Creation date
10/4/2006 10:03:03 PM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Uncompahgre Valley
Title
Upper Gunnison-Uncompahgre Basin Phase 1 Feasibility Study Summary Report
Date
5/1/1989
Prepared For
Colorado Water Resources and Power Development Authority
Prepared By
HDR Engineering, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6-6 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />would provide for municipal water storage and instream flow releases, if an <br />arrangement could be made, whereby the City would utilize these reservoirs to <br />convert its groundwater system to a surface water system in the future. It <br />should be noted that this possibility mayor may not be in accordance with the <br />City's present or future plans regarding their water rights. <br /> <br />The ten recreat ion components cover a variety of activities i ncl udi ng: <br />fishery enhancement, boating, camping, hiking and bicycling. If implemented <br />as a group, the following economic benefits are expected: national publicity, <br />a significant increase in visitor days with associated economic benefits, and <br />a significantly enhanced recreational environment for the local population. <br /> <br />Additionally, Alternative 5 can be staged in a variety of ways; for <br />example, the recreation components could be phase one, one reservoir could be <br />phase two, and the second reservoir could comprise the last stage. This <br />sequence could be reversed or the recreation components could also be phased. <br /> <br />The estimated total capital cost to implement Alternative 5 is <br />approximately $55.5 million. A breakdown of that cost is presented in Table <br />6.6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.