My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01459
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01459
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:07:19 PM
Creation date
10/4/2006 10:03:03 PM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Community
Uncompahgre Valley
Title
Upper Gunnison-Uncompahgre Basin Phase 1 Feasibility Study Summary Report
Date
5/1/1989
Prepared For
Colorado Water Resources and Power Development Authority
Prepared By
HDR Engineering, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2-2 <br /> <br />I <br />I <br />. <br />. <br />. <br />. <br />I <br />I <br />.' <br />I' <br />I <br />. <br />I <br />I <br />. <br />I <br />I <br />. ' <br />I <br /> <br />The term "regulatory" was coined to describe the Wayne N. Aspinall Unit <br />(Aspinall Unit) of the Colorado River Storage Project (CRSP) which was <br />constructed by the Federal government primari ly to regul ate Gunni son Ri ver <br />flows, The Aspinall Unit is comprised of three storage reservoirs located on <br />the main stem of the Gunnison River: Blue Mesa, Morrow Point and Crystal. <br />Flows of the Gunnison River are largely controlled by Blue Mesa Reservoir, the <br />largest and uppermost of the three. Each of the three reservoirs includes a <br />hydroelectric generating facil ity for the purpose of project repayment. The <br />total combined installed capacity of the three plants is 208,000 kilowatts <br />(kW). The primary function of the Aspinall Unit, however, is to regulate <br />streamflow so that water commitments to the Lower Colorado River Basin can be <br />met in dry periods without curtailing the development of water allotted to the <br />Upper Basin. <br /> <br />The only commercial hydroelectric power generating station in the Study <br />Area other than the Aspinall Unit facilities, is the Ouray facility. The <br />Ouray hydropower plant is a 700 kW run-of-river facility owned and operated by <br />the Colorado Ute Electric Association, It is located on the Uncompahgre River <br />within the town of Ouray. <br /> <br />Agri culture has hi stori cally been the 1 argest user of water withi n the <br />Study Area. Irrigated agriculture has been practiced in the area since the <br />late 1800's. Three U.S. Bureau of Reclamation (USBR) projects which provide <br />irrigation water from storage serve agricultural lands within the area. These <br />projects are the Uncompahgre Project (Taylor Reservoir), Bostwick Park Project <br />(Silver Jack Reservoir) and the Dallas Creek Project (Ridgway Reservoir). <br />These projects are owned by the USBR but are operated and maintained by the <br />Uncompahgre Valley Water Users Associ at ion (UVWUA), the Bostwi ck Park Water <br />Conservancy District (BPWCD) and the Tri-County Water Conservancy District <br />(Tri -County) . Each of these organi zat ions is al so responsi bl e for repayment <br />of the project loans. The Uncompahgre Project irrigates 86,000 acres, the <br />Bostwi ck Park Project irrigates 7000 acres, and the Dallas Creek Project <br />provides 11,000 acre-feet (af) of supplemental supply to presently irrigated <br />acreage in the Uncompahgre Valley, <br />
The URL can be used to link to this page
Your browser does not support the video tag.