My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD01455
CWCB
>
Floodplain Documents
>
Backfile
>
1001-2000
>
FLOOD01455
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:06:20 PM
Creation date
10/4/2006 10:02:53 PM
Metadata
Fields
Template:
Floodplain Documents
County
Costilla
Community
San Luis
Stream Name
San Luis area drainageway
Title
Contract Documents for Subdrain and Levee Improvements
Date
6/18/1990
Prepared For
San Luis
Prepared By
WRC Engineering, Inc.
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />w~c ~N6IN~]~~IN6, I~c. <br /> <br />:= <br /> <br />June 19, 1990 <br /> <br />.wJ.OfW)O WA~ <br />~ATION <br />BOARD <br /> <br />Mr, Dave Pacheco <br />Executive Director <br />Conejos/Costllla County Action Agency <br />P.O. Box 299 <br />San Luis, Colorado 81152 <br /> <br />WRC File: 1667/10 <br /> <br />Re: Town of San Luis "Subdrain and Levee Improvements" Project Re-bid <br /> <br />Dear Mr. Pacheco: <br /> <br />As you are aware, the bid prices for the San Luis "Subdrain and Levee <br />Improvements" Project were more than the town's alotted funds for this work, <br />We have been working with the representatives from Colorado Water Conservation <br />Board and the Department of Local Affairs and per their instruction we will <br />re-bid the project with the four original bidders, <br /> <br />The re-bid will include only Schedule A, the subdrain improvements, <br />Schedule A has one additional item included, removal, transporting and <br />stockpiling of the excess trench excavation material to a location near the <br />proposed Levee Improvements. <br /> <br />Costilla County will to construct the Levee Improvements (Schedule B) for <br />the town with the above mentioned stockpiled material. <br /> <br />Attached are the revised contract documents and we are returning the <br />original bid bonds to the contractors, <br /> <br />The dale of the new bid opening is June 27, 1990 at 1:00 p.m. If you have <br />any questions, please call. <br /> <br />Sincerely, <br /> <br />Q:AEERING'INC. <br /> <br /> <br /> <br />David E. Hollingsworth, P,E. <br />Project Manager <br /> <br /> <br />DEH/kad <br /> <br />Enclosure <br /> <br />cc: Mr, Bill Tlmmermeyer <br />Mr. Ken Charles <br />Mr. Larry Lang <br />Pate Construction Company, Inc. <br />Azco Construction, Inc. <br />K,R, SwerdfegerConstructlon, Inc. <br />Parker Excavating, Inc. <br /> <br />CONSULTING ENGINEERS <br /> <br />1660 SOUTH ALBION STREET' SUITE 500' DENVER, COLORADO 80222 . (303) 757,8513 . FAX (303) 7583208 <br />
The URL can be used to link to this page
Your browser does not support the video tag.